Design and construction of eight replacement bridges located on Interstate 95 in Hampden between Exit 174 and Exit 180.
Project Documents
- Responses to Clarifying Questions to Previous Responses (9/10/2019) (PDF)
- Responses to Questions Received on Final RFP (8/27/2019) (PDF)
- WIN-21673.00-Design-Exception-Approved (8/19/2019) (PDF)
- WIN-21673.10-Design-Exception-Approved (8/19/2019) (PDF)
- Responses to Questions Received on Final RFP (8/2/2019) (PDF)
- Hampden Area Projects (PDF)
- Responses to Questions Received on Draft RFP (6/18/2019) (PDF)
- Responses to Questions Received on Draft RFP (6/5/2019) (PDF)
Final Request for Proposals (RFP) and Appendices
- Final RFP – Book 1 General Conditions (PDF)
- Final RFP – Book 2 Project Requirements with Amendment #2 (September 23, 2019) (PDF)
- Final RFP – Book 2 Project Requirements with Amendment #1 (September 10,2019) (PDF) Superseded
- Final RFP – Book 2 Project Requirements (PDF) Superseded
- Appendix A - Federal Wage Rates (PDF)
- Appendix B - Contract Forms and Exhibits
- Appendix C - Public and Stakeholder Meeting Minutes
-
Appendix D - Existing Plans and Inspection Documents
Existing Plans
- 0000-Hampden-1961 (PDF)
- 0000-Hampton-1962 (PDF)
- 1329_I-95-7(59)127_II (PDF)
- 1396_IM-95-5378(0) (PDF)
- 1430-Hampden-1963 (PDF)
- 1430-Hampden-1979 (PDF)
- 1430-Hampden-1987 (PDF)
- 1430-Hampton-1963 (PDF)
- 1431-Hampden-1983 (PDF)
- 1432-Hampden-1979 (PDF)
- 1432-Hampden-1984 (PDF)
- 1433-Hampden-1984 (PDF)
- 1512_I-95-7(14)170 (PDF)
- 576_IR-IRG-95-7(93)167 (PDF)
- 5970-Hampden-1961 (PDF)
- 5970-Hampden-1962-Shop (PDF)
- 5970-Hampden-1983-WS (PDF)
Other Information
- 1432SIA2018 (PDF)
- 1433SIA2018 (PDF)
- 5949SIA2018 (PDF)
- 5950SIA2018 (PDF)
- 5951SIA2018 (PDF)
- 5969SIA2018 (PDF)
- MDOT_01-1297491-v1-BRIDGE_-1433&5951 (PDF)
- MDOT_01-1297489-v1-BRIDGE_-1432&5950 (PDF)
- SIA1430routine (PDF)
- SIA5969routine (PDF)
- SIAHampdenSouadabscookCenter (PDF)
- SIAHampdenSouadabscookCenterUW (PDF)
- SIAHampdenSouadabscookEast (PDF)
- SIAHampdenSouadabscookEastUW (PDF)
- SIAHampdenSouadabscookWest (PDF)
- SIAHampdenSouadabscookWestUW (PDF)
- 1430SIA2018 (PDF)
- 1431SIA2018 (PDF)
- FINAL-5969-RATING-REPORT (PDF)
- eDOCS-DM-Imaging---bridgeclearance (PDF)
- MDOT_01-1314111-v1-FINAL_1430_RATING_REPORT (PDF)
- MDOT_01-1297488-v1-BRIDGE_-1431&5949 (PDF)
- HampdenColdBrookRdSIA (PDF)
- MDOT 01 1691998 v1 LOAD RATING 2017 (PDF)
-
Appendix E - Geotechnical Data Reports
Geotechnical Information
- Corrosivity Test Results (PDF)
- 2019-0222 HAI GDR Center F (PDF)
- 2019-0222 HAI GDR East F (PDF)
- 2019-0222 HAI GDR Emerson F (PDF)
- 2019-0222 HAI GDR West F (PDF)
- 2019-0607 HAI GDR Detour F (PDF)
- MDOT 01-1161981 Subsurface Investigation for West Bridge Souadabscook Stream (PDF)
- Substructure Investigation Proposed Bridges Souadabscook Stream (PDF)
- Subsurface Investigation for Emerson Mills Bridge (PDF)
- Subsurface Investigation for Center Bridge Souadabscook Stream (PDF)
- Substructure Investigation For Proposed Cold Brook Road Bridge (PDF)
-
Appendix F - Traffic Data and Accident Data
Hampden I-95 Bridges Hourly Traffic Volumes (PDF)
Traffic and Accident Data
- TR21728_00 (Excel)
- TR21729_00 (Excel)
- TR21730_00 (Excel)
- 1432_1431map (PDF)
- Accident-Data-Report (PDF)
- Crash-Data-Map5951 (PDF)
- Crash-Data-Summary5951 (PDF)
- Crash-Data-Map5949-5950 (PDF)
- Crash-Data-Summary5949-5950 (PDF)
- TR21673_10_I95NB_Bridge5969 (Excel)
- 1430map (PDF)
- 1430summary (PDF)
- 1432_1431summary (PDF)
-
Appendix H - Survey Data, Wetland Delineation, and Existing Alignments
Conceptual Diversion Alignment
Plans
Survey and Existing ROW
- Existing-ROW (ZIP)
- Existing-ROW-Souadabscook (ZIP)
- Emerson Mill Road Bridge Survey - 100MBs (ZIP)
- Souadabscook Bridges Survey - 1GB (ZIP)
Existing Alignments
- Appendix I – USACE Maine General Permit (PDF)
- Appendix I – Environmental Explanation of RFP RequirementsFinal (PDF)
- Appendix K - Hydrology and Hydraulics
- Appendix L – Utilities
Statement of Interest
- Request for Statement of Interest (PDF)
- Request for Statement of Interest Questions and Responses (PDF)
Current Schedule
Date | Event |
---|---|
February 26, 2019 | MaineDOT Issues RFSOI |
March 5, 2019 at 3:00 PM EST | Deadline for Design-Builders to Submit Questions on RFSOI |
March 19, 2019 | MaineDOT Issues Responses to Questions Received on the RFSOI |
April 12, 2019 at 3:00 PM EDT | Deadline for Design-Builders to Submit SOI |
April 19, 2019 | MaineDOT Issues Notification of SOI Responsiveness of to Design-Builders |
April 22, 2019 | Deadline for Design-Builders to Submit Cure for SOI Responsiveness (If Applicable) |
May 6, 2019 | MaineDOT Evaluates and Ranks SOIs and Notifies Design-Builders of Selection Results |
May 7, 2019 | MaineDOT Issues Draft RFP |
One Meeting Per Team on June 3, 2019 | Design-Builders Attend First Mandatory One-On-One Meetings with MaineDOT |
June 4, 2019 at 3:00 PM EDT | Deadline for Design-Builders to submit Questions on the Draft RFP |
June 18, 2019 | MaineDOT Issues Responses to Draft RFP Questions |
June 25, 2019 | MaineDOT Issues Final RFP |
June 26, 2019 | Begin Date for Design-Builders to Submit ATC Proposals |
June 26, 2019 | Begin Date for Design-Builders to Submit Questions on Final RFP |
One Meeting Per Team between July 8 and July 12, 2019 | Design-Builders Attend Second Mandatory One-On-One Meetings with MaineDOT |
August 13, 2019 at 3:00 PM EDT | Deadline for Design-Builders to Submit ATC Proposals |
August 27, 2019 | MaineDOT Issues Responses to ATC Proposals |
August 13, 2019 at 3:00 PM EDT | Deadline for Design-Builders to Submit Questions Final RFP |
August 27, 2019 | MaineDOT Issues Responses to RFP Questions |
October 1, 2019 at 3:00 PM EDT | Deadline for Design-Builders to Submit Technical and Price Proposal Packages |
October 15, 2019 | MaineDOT Issues Notification of Technical Proposal Responsiveness to Design-Builders |
October 22, 2019 at 3:00 PM EDT | Deadline for Design-Builders to Submit Cure for Technical Responsiveness (If Applicable) |
October 30, 2019 at 11:00 AM EDT | Deadline for Design-Builders to Submit Proposal Guaranty Package |
October 30, 2019 at 11:00 AM EDT | MaineDOT Opens Price Proposals |
November 2019 | MaineDOT Awards Contract |
Winter 2019 | Design-Builder Begins Final Design & Construction |
November 30, 2022 | Design-Builder Completes Final Design & Construction |