Culvert Rehabilitation In Winslow
Winslow ? Culvert rehabilitation work started on US Route 137 in Winslow Monday, July 16th. Alternating one-way traffic, controlled by flaggers, will assist motorists through the work zone, located approximately one-half mile south of the intersection of Route 137 and Pond Road.
Crews will be installing prefabricated sections to rehabilitate the deteriorated portion. In addition to this work, approximately 200 ft of shoulder on each side of the roadway will be widened and paved to allow for the installation of guardrails.