Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| LAP025617.00 | Bangor (LAP) | Broadway Pedestrian Safety Improvements Project: Located on Broadway, beginning just north of Husson Avenue and extending northerly to Grandview Avenue for a total of 0.13 miles. Please Note: A Prebid meeting was held on August 9, 2022 at 2:00 p.m. at the City of Bangor's Engineering Department, 73 Harlow Street, Bangor, Maine. |
Opened | ||
| PH20220727R1P | Region 1 | On Call Plumbing Services. |
Awarded | ||
| LAP023112.00, LAP023114.00 | Brewer / Bangor (LAP) | Penobscot Bridge Corridor Signal Improvements Project: Located along the Penobscot Bridge Corridor from State/Oak Street Bangor to State/North Main Street Brewer. Please Note: A Prebid meeting was held on August 10, 2022, at 2:00 p.m. at the City of Bangor's Engineering Department, 73 Harlow Street, Bangor, Maine.
|
Opened | ||
| PH20220817SPBO | Belgrade / Rome / Oakland | Snow Plowing and Ice Control:
|
Rejected | ||
| PH20220727SPMB | Milo/Brownville/Ebeemee Twp./T4 R9 NWP/Long A Twp./T4 Indian Purchase Twp./T3 Indian Purchase Twp./Millinocket | Snow Plowing and Ice Control: Located on State Route 11, beginning at the intersection of State Route 6 in Milo (MP 221.54) and extending in a northerly direction to the Millinocket Urban Compact Line (MP 259.62) for a total distance of 38.08 centerline miles (76.16 Lane Miles). |
Awarded | ||
| LAP022134.00 | Portland (LAP) | Washington Avenue Roadway, Intersection/Signals, Sidewalk and Streetscape Project. Please Note: A mandatory pre-bid meeting was held in the Training Room at the Department of Public Works Building, 250 Canco Road, Portland, Maine on Wednesday, August 3, 2022, at 8:00am. |
Opened | ||
| LAP0018651.00 | Auburn (LAP) | Mill, Main and Broad Streets Intersection and Corridor Improvements: Located along Mill, Maine and Broad Streets, from the Little Androscoggin River to the Intersection of Broad Street and River Road.
|
Opened | ||
| 021162.22E | Byron / Rangeley Plantation | Excavators - Equipment Rental with an Operator: Located on Route 17, beginning in Byron and extending to Rangeley Plantation. |
Awarded | ||
| 028039.00 | Benedicta / Silver Ridge | Gravel Surface Repair: Located on the Pond Road, Benedicta Twp. & Silver Ridge Twp. |
Awarded | ||
| LAP018656.01 | Lewiston (LAP) | East Avenue and Lisbon Street Traffic Signal Upgrades Please Note: All bidders were required to preregister and attend a pre-bid Zoom Conference Wednesday, July 20, 2022, at 10:00 A.M. Attendance at this meeting by the Bidder or his/her qualified representative is a mandatory prerequisite for the acceptance of a bid from that Contractor. |
Opened | ||
| LAP026578.00 | T1 R9 WELS (LAP) | The Lakes Public Bathroom Project: Located on the Baxter State Park Road, approximately 8 miles west of Millinocket, adjacent to North Woods Trading Post |
Opened | ||
| 017281.00 | Searsport | Highway Reconstruction: Located on Routes 1/3, beginning at Savage Road and extending northeasterly 1.92 miles to Station Avenue. This Project has been Withdrawn and may or may not re-advertise in the future. |
Rejected | ||
| PH20220629TV3 | Region 3 | Closed Circuit Television Services. |
Awarded | ||
| 022839.00 | Camden | Slope Stabilization: Project is located on Route 1, approximately 0.03 mile northeasterly of Harden Avenue. |
Awarded | ||
| PH20220629R3P | Region 3 | Pumping Floor Drains & Holding Tanks Effluent. |
Awarded | ||
| 021727.01 | Greenbush | Boom Bridge Replacement: Located on U.S. Route 2/Main Road over Boombridge Brook, approximately 2.4 miles northerly of Milford town line. |
Awarded | ||
| PH20220629TV2 | Region 2 | Closed Circuit Television Services. |
Awarded | ||
| 021162.22C, 021162.23C, 021162.24C, 021162.25C | Region 3 | Catch Basin Cleaning and Vacuuming. |
Awarded | ||
| LAP022204.00 | Southwest Harbor (LAP) | Main Street Sidewalk, Drainage, Water, and Sewer Improvements: Project is located on Main Street (State Route 102), beginning approximately 500 LF South of Wood Street and extending 400 LF North of Apple Lane. Please Note: A pre-bid conference was held Friday, July 1, 2022 at 10 o'clock a.m. (prevailing time) at the Southwest Harbor Town Office, 22 Village Green Way, Southwest Harbor, Maine 04769. |
Opened | ||
| PH20220622RCS | Regions 1, 2 and 4 | Transfer Bridge Remote Control System Services at various Marine Ports, in Knox, Waldo, Hancock, and Cumberland Counties: The project is located at the Marine Ports in Rockland, Vinalhaven, North Haven, Lincolnville, Isleboro, Tremont (Bass Harbor), Swans Island, Frenchboro, Portland and Peaks Island. |
Awarded | ||
| 025409.00 | St. John Plantation | St. John Plantation: Large Culvert Improvements, Rte.161 |
Awarded | ||
| PH20220622HV5 | Region 5 | VAC Preventative Maintenance and Repair Work: Various locations in the Counties of Aroostook, Penobscot, and Washington, Maine. Awarded to on August 8, 2022:
|
Awarded | ||
| PH20220622R5P | Region 5 | On Call Pumping and Drainage Services: Various locations in the Counties of Aroostook, Penobscot, and Washington, Maine. Awarded to:
|
Awarded | ||
| 024209.00 | Palmyra | Highway Safety Improvements: Project is located at the intersection of Route 2 and Route 152. |
Awarded | ||
| 024547.00, | See Summary Below | Rumble Strip Installation: Various locations Statewide as described in the contract documents. Acton, Alfred, Amherst, Bethel, Brookton, Chelsea, Danforth, Devereaux, Dover-Foxcroft, Edgecomb, Eliot, Enfield, Farmington, Frankfort, Gorham, Greenwood, Harrington, Hollis, Jefferson, Jonesboro, Kenduskeag, Lebanon, Leeds, Lincoln, Monmouth, Newcastle, New Gloucester, Nobleboro, North Berwick, Northport, Peru, Prospect, Rockport, South Berwick, Topsham, Wales, Weston, West Paris, Warren, Waterboro, Wayne, Wells, Whitefield, Wilton, Windsor, Winterport, Winthrop, and Woodstock, Township of TWP 22, and Cities of Auburn, Augusta, Bangor, Belfast and Sanford - Regions 1-5 |
Awarded | ||
| 021803.00 | New Sweden | Large Culvert Replacement: Project is located on Route 161, approximately 0.96 mile north of Jepson Road. |
Awarded | ||
| PH20220608BG5 | Region 5 | On Call Building & Grounds Maintenance and Repair Services. |
Awarded | ||
| 024807.00 | Dover-Foxcroft / Hampden / Mount Desert Island / Southwest Harbor | ADA Curb Ramp Improvements: Various locations in the Counties of Hancock, Piscataquis and Penobscot. |
Awarded | ||
| PH022376.00P | West Gardiner | Supply and Delivery of Pile Casing Rehabilitation Jackets for Delivery to the MaineDOT facility in West Gardiner. |
Rejected | ||
| 021894.01, 021900.01 | Waterville | Interstate 95 Northbound and Southbound Bridge Replacement projects: Located on Interstate 95 over Webb Road, approximately 1.4 miles northerly of Sidney town line. |
Awarded |
