Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| PH20220928FER | Rockland / Lincolnville | Snowplowing and Ice Control at the Ferry Terminals. Projects are located at:
|
Awarded | ||
| PH20221005SPB | Boothbay Harbor / Boothbay / Edgecomb | Snow Plowing and Ice Control: Located:
Total contract mileage is 11.50 centerline miles (23.58 lane miles). |
Rejected | ||
| 024617.00 | Waterford | Large Culvert Replacement: Located on Route 118, approximately 1.21 miles west of Hersey Road at Norway Road Bridge. |
Awarded | ||
| 023138.00 | Waterville & Winslow | Waterville-Winslow, Ticonic Bridge Project #2854. Please Note: Only Contractors that become Prequalified will be Eligible to bid on the project. |
Awarded | ||
| 023619.00 & 023649.00 | Warren and Thomaston | Bridge Substructure Rehabilitation/located in Knox County, James Andrew Griffith bridge on the US Route 1/ Atlantic Highway Warren - Thomaston town line over St. George River. /St. George River bridge is located on Camden Road / State Route 90 over St. George River located approximately 0.04 of a mile southwesterly of Conary Lane. |
Awarded | ||
| PH028135.00 | Regions 1, 2, 3, 4, and 5 | On Call Specialized Bridge Welding. Awarded to:
|
Awarded | ||
| PH20220921SPWC | Winslow / China | Snow Plowing and Ice Control: Located in:
Total contract mileage is 13.27 centerline miles (26.83 Lane Miles). |
Rejected | ||
| LAP025215.00 | Harpswell (LAP) | Safe Harbor Great Island Marina Redevelopment: Project is located at 419 Harpswell Islands Road and in Orrs Bay. |
Opened | ||
| RFP022511.01, RFP022512.01 | Old Town | Request for Proposals for Construction Manager/General Contractor (CM/GC) Preconstruction Services for the Old Town, Llewellyn Estes Bridge #1 and #2. |
Opened | ||
| 023094.01 | Litchfield / West Gardiner | Babcock Bridge Replacement: Located on the Lewiston Road / Route 9 / Route 126, over Cobbosseecontee Stream at the Litchfield / West Gardiner town line. |
Awarded | ||
| 022356.01 | Stonington / Deer Isle | Mill Hill Bridge Replacement: Project is located on North Stonington Road / South Deer Isle Road / State Route 15 over Mill Pond Outlet on the Stonington / Deer Isle town line. |
Awarded | ||
| 025103.00 | Brewer - Region 4 | Lighting at I-395 Exit 5, in Brewer. |
Awarded | ||
| 028047.00 | Auburn | Concrete Wearing Surface Replacement on Iron Bridge #3895: Project is located on Route 136/Main Street in Auburn. |
Awarded | ||
| PH20220831SPJW | Jefferson / Whitefield | Snow Plowing and Ice Control: Located on:
Total contract mileage is 12.48 centerline miles (24.96 Lane Miles).
|
Rejected | ||
| 024685.00 | Portland | Casco Bay Ferry Terminal Improvements: Located at the Peaks Island and Long Island Ferry Terminals. |
Awarded | ||
| PH20220824BG | Region 1 | On Call Building & Grounds Maintenance and Repair Services: Located in the Region 1 area. |
Awarded | ||
| RFP024153.00, RFP024159.00, RFP024161.10, RFP025283.00 & RFP025445.00 | Northport, Nobleboro, Waldoboro, Newcastle, Edgecomb, Wiscasset, Warren & Rockport | Request for Proposals for Construction Manager/General Contractor(CM/GC)Preconstruction Services for the Midcoast Maine Paving Bundle/The Paving Bundle consists of a package of 5 total segments located on Route 1 (Northport, Nobleboro, Waldoboro, Newcastle, Edgecomb, and Wiscasset) and Route 90 (Warren-Rockport). |
Awarded | ||
| PH20220817SPEC | Eustis /Jim Pond Twp. / Alder Stream Twp. / Chain of Ponds Twp. / Coburn Gore | Snow Plowing and Ice Control: Located on State Route 27, beginning at the intersection of State Route 16 in Eustis (RLM 126.02) and extending in a northwesterly direction to the United States border in Coburn Gore (RLM 154.05), for a total distance of 28.03 centerline miles (56.06 Lane Miles). |
Rejected | ||
| PH20220810R4P | Region 4 | On Call Floor Drain Pumping: Various locations in Region 4, in the Counties of Washington, Hancock, Penobscot, Piscataquis and Somerset. Awarded to on September 16, 2022:
|
Awarded | ||
| PH20220810MRA | Medway | Medway Rest Area Services: Project is located on Interstate 95 Northbound and Southbound in Medway, Maine. |
Awarded | ||
| PH20220907APR | Augusta | Aluminum Panel Refurbishing, in the city of Augusta: Stripping sign sheeting and adhesive material from aluminum extruded panels. Location - Picked up and delivered to the MaineDOT Paint Warehouse, located at 121 Leighton Road in Augusta. |
Awarded | ||
| 027911.00 | Eliot | Culvert Replacement: Located on 145 Beech Road. |
Awarded | ||
| PH20220803MBH | Regions 1 & 2 | Movable Bridge Hydraulics Repair. |
Awarded | ||
| PH20220803SPB | Boothbay Harbor / Boothbay / Edgecomb | Snow Plowing and Ice Control: Located on:
Total contract mileage is 11.50 centerline miles (23.58 lane miles). |
Opened | ||
| 018724.00 | Batchelders Grant Twp. | Evans Brook Bridge Deck Replacement: Located over Evans Brook, approximately 1.44 miles southerly of the Gilead town line. |
Awarded | ||
| PH20220803SPW | Wiscasset / Dresden / Pittston | Snow Plowing and Ice Control: Located on Route 27, beginning at the junction of Route 1 in Wiscasset (MP 20.25) and extending northerly to the junction of Old Cedar Grove Road in Pittston (MP32.11), for a total distance of 11.86 centerline miles (23.76 lane miles). |
Awarded | ||
| 023785.00 | Wallagrass | Highway Safety Improvements: Located on Soldier Pond Road, beginning 0.14 mile west of Bridge No. 3901 and extending easterly 0.12 mile. |
Awarded | ||
| PH20220727R1P | Region 1 | On Call Plumbing Services. |
Awarded | ||
| PH20220817SPBO | Belgrade / Rome / Oakland | Snow Plowing and Ice Control:
|
Rejected | ||
| PH20220727SPMB | Milo/Brownville/Ebeemee Twp./T4 R9 NWP/Long A Twp./T4 Indian Purchase Twp./T3 Indian Purchase Twp./Millinocket | Snow Plowing and Ice Control: Located on State Route 11, beginning at the intersection of State Route 6 in Milo (MP 221.54) and extending in a northerly direction to the Millinocket Urban Compact Line (MP 259.62) for a total distance of 38.08 centerline miles (76.16 Lane Miles). |
Awarded |
