MaineDOT Logo

Archived Bid Opportunities

Bid Date WIN(s) Municipality Summary Status Date posted
021663.00, 022276.01 Bangor

Interstate 95/Broadway Bridge Replacement and Broadway Street safety improvements:
Located approximately 1.7 miles westerly of Exit 187.
 

Awarded
026998.00 Houlton

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:
Project is located on US Route 1 in Houlton, beginning at US Route 2 and extending North 1.90 miles. Includes 0.34 of a mile on US Route 1 South.

Opened
029233.00 Greene - Region 2

Large Culvert Replacement:
Project is located on Route 202 in Greene at the intersection of Sprague Mills Road.

Awarded
025427.00 Farmington

Culvert Slip Line:
Project is located on Route 2 in Farmington.

Awarded
024163.00 Saco

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

Project is located on US Route 1 in Saco, beginning 0.02 miles South of Cascade Road (Route 98) and extending North 1.06 miles to the Scarborough town line.

Awarded
PH20230510BGM Regions 2 & 4

On Call Building & Grounds Maintenance and Repair Services at Multimodal Facilities and Moveable Bridge Piers.

Awarded
026021.00 Hollis

Traffic Signal at Route 202/Route 35 in Hollis:
Project is located at Route 202/Route 35 in the town of Hollis.

Awarded
025125.00 Auburn

Pavement Milling, HMA Overlay with Drainage & Safety Improvements.

Project is located on:

  • US Route 202 in Auburn, beginning 0.07 miles North of Little Androscoggin River Bridge and extending North 2.52 miles to 0.05 miles South of Elm Street. 
  • US Route 202S, beginning 0.02 miles South of High Street and extending South 2.72 miles to 0.05 miles South of Chasse Street on ramp.

Includes crossovers and ramps. 

Opened
026486.00 / 026630.05 Columbia /Jonesboro, Machias / East Machias

Pavement Milling, HMA Overlay, Cold In-Place Recycle with Drainage and Safety Improvements:

  • 026486.00 is located on Route 1, beginning 0.11 of a mile from Addison Road and extending east 9.84 miles. 
  • 026630.05 is located Route 1, beginning 0.03 of a mile east of the Whitneyville town line and extending north 6.59 miles.
Awarded
PH20230503VGMT Regions 1-2-3-5

Vegetation Management Services.

Awarded to:

  • Aroostook Arboriculture Inc of Presque Isle, ME-Region 1, 2, 5
  • Donald Dubois dba Dubois Contracting of Fort Kent, ME-Region 3.
Awarded
025525.00 Houlton / Ludlow / New Limerick / Oakfield / Smyrna

Pavement Milling, HMA Overlay, Ultra-Thin Bonded Wearing Course with Drainage and Safety Improvements:
Project is located on Interstate 95 Southbound, beginning at the Canadian/US Border Customs Crossing in Houlton and extending 19.27 miles South to the Oakfield/Dyer Brook town line.
 

Opened
025377.00 Brewer

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

Project is located on Route 15 (South Main Street) in Brewer, beginning at Abbott Street and extending North 0.97 of a mile to Wilson Street. 

Awarded
025395.00 Topsham

Large Culvert Rehabilitation:
Project is located on Interstate 295 Northbound, approximately 1.26 miles north of the Exit 31 on-ramp. 

Awarded
025391.00 Auburn

Large Culvert Rehabilitation:

Project is located on Route 202, approximately 0.19 mile north of Eastman Lane.
 

Awarded
PH20230503ROL Statewide

On Call Rollers and RC Trench Rollers - Equipment Rental without an Operator.

Awarded to:

  • Houlton Rental Center, Inc. of Houlton, ME-Region 5.
  • Eagle Rental of Waterville, ME-Regions 1,2,3,4,5.
  • Shaw Brothers Construction of Gorham, ME-Regions 1,2,3.
  • United Rentals (North America), Inc. of Oakland, ME-Regions 1,2,3,4,5.
Awarded
025997.00 Windham

Pavement Milling, HMA Overlay with Drainage and Safety Improvements:

Project is located on US Route 302 in Windham, beginning at US Route 202 and extending North 2.82 miles to River Road.

Awarded
LAP025379.00 Bangor - (LAP)

Oak Street Resurfacing Project:

Located along a portion of Oak Street, starting at State Street and extending southerly 0.23 miles to Washington Street, Bangor, Maine.

Opened
021840.00 Westfield

Living Snow Fence & Safety Improvements:
Project is located on U.S. Route 1, beginning 0.05 miles south of Cambridge Road and extending north approximately 0.30 miles.

Rejected
025385.00 Gray

Drainage Improvements:

Located at the intersection of U.S Route 202, with Route 115, and Route 26. 

Rejected
026908.00 Westport / Wiscasset

Bridge Paint Project:
In Lincoln County, Westport - Wiscasset bridge over Cowsweag Narrows on the Main Road/State Route 144 town line.

Awarded
026452.00 Portland

Fore River Parkway and Congress & Park Street Bridge Paint projects, in Cumberland County:

  • Interstate 295 Northbound (Bridge No. 6292) and Southbound (Bridge No. 6556) over Fore River Parkway, approximately 0.6 of a mile north of South Portland city line. 
  • Interstate 295 Northbound (Bridge No. 6294) and Southbound (Bridge No. 6535) over Congress & Park Streets, approximately 0.75 of a mile north of South Portland city line.
Awarded
022256.00 Webster Plantation

Mattagodus Bridge Replacement in Penobscot County:

Located on Park Street/State Route 170 over Mattagodus Stream, approximately 0.43 of a mile southeasterly of the Kingman Township line.
 

Awarded
PH20230419MOW Regions 2, 4 & 5

Controlled Access Highway and Interstate Mowing Including Litter Removal in Regions 2, 4 & 5.

 

Awarded to Roy Services Inc. of Limestone, ME; Region 2, Section 2; Region 4, All Region Sections

Awarded to Jackett Enterprises of Houlton, ME; Region 5 Litter Removal Only.

Awarded
Ashland, Portage Lake & Nashville Plantation - Region 5 Ashland / Portage Lake / Nashville PLT.

Pavement Milling, HMA Overlay with Drainage & Safety Improvements:

  • 024690.00 is located on Route 163 in Ashland, beginning at Route 11 and extending East 0.59 of a mile.
  • 026626.10 is located on Route 11, beginning in Ashland at Route 163 and extending North 16.24 miles to Portage Lake.
Awarded
PH20230419MOW Regions 2, 4, & 5

Controlled Access Highway and Interstate Mowing, including Litter Removal.

Awarded to:

  • Roy Services Inc. of Limestone, ME, on May 15, 2023: Region 2-Section 2; Region 4-All Region Sections.
  • Awarded to Jackett Enterprises of Houlton, ME, on June 13, 2023:  Region 5-Litter Removal Only.
Awarded
027304.00 Limerick

Large Culvert Replacement:
Project is located on Route 11 in Limerick, at the intersection of Dog Road.

Awarded
024211.00 Monson / Clifton / Prospect

Road Weather Information Systems, in Piscataquis, Penobscot and Waldo counties:

Project is located in the towns of Monson, Clifton & Prospect.

Awarded
026630.04, 026724.00 Columbia / Harrington / Whiting / Eastport

Pavement Milling & Ultra-Thin Bonded Wearing Course with Safety Improvements.

  • 026630.04:
  1. Section 1 is located on US Route 1 in Whiting, beginning 0.02 of a mile West of Gardiner Lake Road and extending East 3.77 miles. 
  2. Section 2 is located in Eastport on Route 190, beginning at the Pleasant Point town line and extending South 3.97 miles.
  • 026724.00:
  1. Section 1 is located on US Route 1A in Harrington, beginning 0.54 of a mile East of Shop Hill Road and extending East 3.08 miles.
  2. Section 2 is located on US Route 1 in Harrington, beginning at US Route 1A and extending North 2.51 miles.
Awarded
PH20230412R2P Region 2

On Call Plumbing Work.

Awarded
025285.00, 026696.00, 026698.00 Mechanic Falls / New Gloucester / Poland / Auburn

Pavement Milling, HMA Overlay, Ultra-Thin Bonded Wearing Course with Drainage and Safety Improvements:

  • 025285.00 is located on Route 122, beginning at the Auburn/New Gloucester town line and extending West 3.57 miles to Maine Street (Route 26) in Poland.
  • 026696.00 is located on Route 26, beginning 0.17 miles South of Route 122 in Poland and extending North 5.66 miles to 0.10 miles North of Route 11 in Mechanic Falls.
  • 026698.00 is located on Route 122 in Auburn, beginning at Route 4 and extending West 1.49 miles to the New Gloucester town line. 
Awarded