Waterville I-95 Trafton Road Interchange Draft Environmental Assessment
Final Environmental Assessment and FONSI
- Final Document (PDF)
Final Attachments for Environmental Assessment and FONSI Documents
Alternate Plans
- Diamond Interchange (PDF)
- Partial Cloverleaf (PDF)
- Re-routing of the Sidney Town Farm Road (PDF)
Cultural Resource Correspondence
- State Preservation Commission Concur No Effect (PDF)
- Tribal Historic Preservation Office (PDF)
- Waterville 18129.0 Archeology No Effect w/Exclusion Area (PDF)
Rare, Threatened, and Endangered Species Correspondence
- Deer Wintering Area (PDF)
- MDIFW Response (PDF)
- MNAP Response (PDF)
Phase 1 Environmental Investigation
Highway Noise Analysis
- Highway Noise Analysis (PDF)
FEMA Food Map
- Flood Map (PDF)
Farmland Impact Calculations
Comments and Responses to Draft EA
Draft Documents
Access Justification Report
Environmental Assessment Document
Document Attachments
- Alternatives
- 001 lan 11-18-13 (JPEG)
- 2233-03 CONCEPT1 2012 JULY 02 (PDF)
- 2233-03 CONCEPT2 2012 aug 30 (PDF)
Phase 1
Historic
- SHPO Concurs No Effect 8.28.13 (PDF)
- Waterville 18129.00 Archaeology No Effect with Exclusion Area 7.18.13 (PDF)
Natural Resources
Noise
RTE
- MDIFW DWA Response (PDF)
- MDIFW Response (PDF)
- MNAP Response (PDF)
FEMA
- Flood Map FM23011C0164D (PDF)
Farmland