Sarah Mildred Long Bridge Temporary Closure
Augusta, ME (July 8, 2025) – The Maine Department of Transportation (MaineDOT) along with the New Hampshire DOT will conduct an inspection of the Sarah Mildred Long Bridge Tuesday, July 15, 2025 and Wednesday, July 16, 2025. The lift bridge carries the Route 1 Bypass over the Piscataqua River between Kittery, Maine and Portsmouth, New Hampshire.