The Project includes the design and construction of six replacement bridges located in Sidney, ME and Waterville, ME, between Exit 113 and Exit 127. The project consists of five site locations: Dinsmore Road over I-95, Lyons Road over I-95, Drummond Road over I-95, Town Farm Road over I-95, and Trafton Road over I-95.
Project Documents
Sidney-Waterville I95 RFSOI (PDF)
Civil Rights Supplemental REV & EEO (PDF)
Appendix A - Proposers General Information Form (PDF)
Sidney-Waterville Bridge Q-A (PDF)
Request for Proposals Book 1 - Design Build Low Bid General Conditions (PDF)
Request for Proposals Book 2 - Project Requirements (PDF)
Appendix A - Federal Wage Rates
Appendix B - Contract Forms and Exhibits
Appendix C - Public and Stakeholder Meeting Minutes
Appendix D - Existing Plans and Inspection Documents
- Dinsmore Road, (Bridge #5782), Inspection Report (PDF)
- Dinsmore Road, (Bridge #5782), Plans (PDF)
- Dinsmore Road, (Bridge #5782), Shop Drawings (PDF)
- Lyons Road, (Bridge #s1463, 5783, 5784), Plans, 2020 (PDF)
- Lyons Road, (Bridge #s1463, 5783, 5784), Inspection Report (PDF)
- Lyons Road, (Bridge #1463), Bid (PDF)
- Lyons Road, (Bridge #1463), Shop Drawings, 1958 (PDF)
- Lyons Road, (Bridge #1463), Plans, 1992 (PDF)
- Lyons Road, (Bridge #5783), Inspection Report (PDF)
- Lyons Road, (Bridge #5783), Plans (PDF)
- Lyons Road, (Bridge #5783), Shop Drawings (PDF)
- Lyons Road, (Bridge #5783), Plans 2 (PDF)
- Drummond Road, (Bridge #5784), Inspection Report (PDF)
- Drummond Road, (Bridge #5784), Plans,1958 (PDF)
- Drummond Road, (Bridge #5784), Shop Drawings,1958 (PDF)
- Town Farm Road, (Bridge #5785), Inspection Report, (PDF)
- Town Farm Road, (Bridge #5785), Plans, 1958 (PDF)
- Town Farm Road, (Bridge #5785), Plans 2, 1958 (PDF)
- Town Farm Road, (Bridge #5785), Bridge Rail Plans, 2017 (PDF)
- Trafton Road, (Bridge #5812), Inspection Report (PDF)
- Trafton Road, (Bridge #5812), Plans, 1958 (PDF)
- Trafton Road, (Bridge #5812), Interchange Plans, 2017 (PDF)
- Trafton Road, (Bridge #5812), Joint Plans, 1992 (PDF)
- Interstate 95, Dinsmore to Lyons, Plans, (PDF)
- Interstate 95, Drummond to Trafton, Plans, (PDF)
- Interstate 95, Lyons to Drummond, Plans (PDF)
- Interstate 95, Old Belgrade to Dinsmore, Plans (PDF)
- Interstate 95, Trafton to Kennedy Memorial Drive, Plans (PDF)
Appendix E - Geotechnical Data
- Dinsmore Road, (Bridge #5782), Geotechnical Report (PDF)
- Drummond Road, (Bridge #5784), Geotechnical Report (PDF)
- Lyons Road, (Bridges #1463 & #5783), Geotechnical Report (PDF)
- Town Farm Road, (Bridge #5785), Geotechnical Report (PDF)
- Trafton Road, (Bridge #5812), Geotechnical Report (PDF)
Appendix F - Traffic and Accident Data
- Dinsmore Road, (Bridge #5782), Crash Map (PDF)
- Dinsmore Road, (Bridge #5782), Crash Report (PDF)
- Dinsmore Road, (Bridge #5782), Traffic Update (XLS)
- Lyons Road, (Bridges #1463 & #5785), Crash Map (PDF)
- Lyons Road, (Bridges #1463 & #5785), Crash Report (PDF)
- Lyons Road, (Bridges #1463 & #5785), Traffic Update (XLS)
- Drummond Road, (Bridge #5784), Crash Map (PDF)
- Drummond Road, (Bridge #5784), Crash Report (PDF)
- Drummond Road, (Bridge #5784), Traffic Update, (XLS)
- Town Farm Road, (Bridge #5785), Crash Map (PDF)
- Town Farm Road, (Bridge #5785), Crash Report (PDF)
- Town Farm Road, (Bridge #5785), Traffic Update (XLS)
- Trafton Road, (Bridge #5812), Crash Map (PDF)
- Trafton Road, (Bridge #5812), Crash Report (PDF)
- Trafton Road, (Bridge #5812), Traffic Update (XLS)
Appendix G - Survey Data, Wetlands Delineation, and Existing Alignments
Dinsmore
Drummond
Lyons
Town Farm
Trafton
Appendix H - Permits and Other Environmental Information
- Dinsmore Road, (Bridge #5782), Habitat Assessment Report (PDF)
- Drummond Road, (Bridge #5784), Habitat Assessment Report (PDF)
- Lyons Road, (Bridges #1463 & #5785), Habitat Assessment Report (PDF)
- Town Farm Road, (Bridge #5785), Habitat Assessment Report (PDF)
- Trafton Road, (Bridge #5812), Habitat Assessment Report (PDF)
Appendix I - Supplemental Specifications and Special Provisions
- 203 SP - Ultra Lightweight Foamed Glass Aggregate (PDF)
- 502 SP - Deck Concrete Shrinkage Option 1 (PDF)
- 502 SP - FRP Bridge Drain (PDF)
- 507 SP - Steel Approach Rail (PDF)
- 510 SP - Special Detour (PDF)
- 524 SP - Protective Shield (PDF)
- 530 SP - GFRP Reinforcing (PDF)
- 607 SP - Chain Link Snow Fence (PDF)
- 703 SP - Deck Concrete Shrinkage Tarantula Curve (PDF)
Appendix J - Utilities
Utilities List Sidney-Waterville (PDF)
Current Schedule
Date | Event |
---|---|
3/25/2025 | MaineDOT Issues RFSOI |
4/8/2025 at 3:00 PM EST | Deadline for Design-Builders to Submit Questions on RFSOI |
4/22/2025 | MaineDOT Issues Responses to Questions Received on the RFSOI |
4/29/2025 at 3:00 PM EDT | Deadline for Design-Builders to Submit SOI |
5/6/2025 | MaineDOT Issues Notification of SOI Responsiveness to Design-Builders |
5/13/2025 | Deadline for Design-Builders to Submit Cure for SOI Responsiveness (If Applicable) |
5/27/2025 | MaineDOT Evaluates and Ranks SOIs and Notifies Design-Builders of Selection Results |
7/1/2025 | MaineDOT Issues Draft RFP |
7/14/2025 at 3:00 PM EDT | Deadline for Design-Builders to submit Questions on the Draft RFP |
8/13/2025 | MaineDOT Issues Responses to Draft RFP Questions |
10/1/2025 | MaineDOT Issues Final RFP |
One Meeting Per Team between October 27 and November 21, 2025 | Design-Builders Attend One-On-One Meetings with MaineDOT to Review Potential ATC Proposals (If applicable) |
12/19/2025 at 3:00 PM EDT | Deadline for Design-Builders to Submit ATC Proposals |
2/6/2026 | MaineDOT Issues Responses to ATC Proposals |
2/18/2026 at 3:00 PM EDT | Deadline for Design-Builders to Submit Questions on Final RFP |
3/6/2026 | MaineDOT Issues Responses to Final RFP Questions |
4/1/2026 at 3:00 PM EDT | Deadline for Design-Builders to Submit Technical and Price Proposal Packages |
4/15/2026 | MaineDOT Issues Notification of Technical Proposal Responsiveness to Design-Builders |
4/22/2026 | Deadline for Design-Builders to Submit Cure for Technical Responsiveness (If Applicable) |
5/13/2026 at 11:00 AM EDT | Deadline for Design-Builders to Submit Proposal Guaranty Package |
5/13/2026 at 11:00 AM EDT | MaineDOT Opens Price Proposals |
6/10/2026 | MaineDOT Awards Contract |
Summer 2026 | Design-Builder Begins Final Design & Construction |
6/30/2031 | Design-Builder Completes Final Design & Construction |