Limington/Standish? Crews are performing repair work on the Steep Falls Bridge, connecting Limington and Standish today (Tue) and Wednesday, September 12th.
Due to this project, there will be an alternating one-way traffic pattern over the bridge each day from 7 a.m. to 5 p.m., with flaggers assisting motorists through the area.
Work on this steel bridge truss involves the strengthening of a corroded area.