WIN(s): 022216.00
Advertised Date:
Municipality: Houlton
Summary:
The scope of work includes reconstruction of sidewalks and pedestrian crossings on Market Square, Main Street, Water Street, and Broadway; also includes bituminous pavement, new granite curb, resetting existing granite curb, stamping/coloring sidewalk segments, some lighting resetting/relocating work, new lighting, catch basin/storm drain installation, concrete work around trees, concrete retaining wall, and other incidental work.
This is a locally administered project.
Bid Date: