Archived Bid Opportunities
| Bid Date | WIN(s) | Municipality | Summary | Status | Date posted |
|---|---|---|---|---|---|
| 022879.00 | Hermon | Intersection Improvements: Located at the intersection of Route 2 and Annis Road. |
Awarded | ||
| 026495.00 | Belgrade / Manchester / Readfield / Oakland | Culvert Replacements: Located on Route 135 in Belgrade, Manchester, Readfield, and Route 23 in Oakland. |
Awarded | ||
| 026217.00B, 026219.00B | Enfield / Jonesboro | Design and Build Cold Storage Buildings: Located in Penobscot County at 869 Main Road in Enfield, and in Washington County, at 615 U.S. Route 1 in Jonesboro. |
Awarded | ||
| PH20200624ITS | Statewide | On Call Intelligent Transportation Systems Operations and Repair Work, Statewide. Awarded to:
|
Awarded | ||
| 023617.50, 023617.60, 024119.00, 024173.00 | Carmel / Hampden / Hermon / Newburgh / Orono /Veazie / Bangor / Old Town | Bridge Work, Pavement Milling, Ultra-Thin Bonded Wearing Course, and Hot Mix Asphalt Overlay with Safety Improvements: Various locations on Interstate 95 Northbound and Southbound, as shown in the Bid Documents. |
Awarded | ||
| 026319.00 | Kingfield | Design and Build a Cold Storage Building: Located at 558 Main Street in Kingfield. |
Awarded | ||
| 023761.00, 024255.00 | Statewide | Statewide Centerline and Edgeline Rumble Strips: Project is located Statewide as shown in the Bid Documents. |
Awarded | ||
| 022270.00, 022324.00 | Auburn / Lewiston | Bridge Joint Replacement Projects:
|
Awarded | ||
| RFP018283.00, RFP022608.00, RFP022610.00 | Camden - Region 2 (RFP) | Request for Proposals for Construction Manager/General Contractor (CM/GC) Preconstruction Services for the Camden Highway and Bridges Project: Located on US Route 1, beginning 0.56-mile northerly of Sagamore Farm Road and extending northerly 1.54 miles to the Lincolnville town line. The project also includes the replacement of Spring Brook Bridge (#2794) located over Spring Brook, and Great Brook Bridge (#2326) located over Great Brook. |
Awarded | ||
| 025340.00 | Augusta | Child Street Headquarters Roof Replacement Project: Located at 24 Child Street. Please Note: A mandatory prebid meeting and site walk through will be held on June 17, 2020, starting at 9:00 A.M. at the MaineDOT Headquarters, 24 Child Street, Augusta. |
Awarded | ||
| 022885.00 | Houlton | Intersection Improvements: Located at the intersection of U.S. Route 1 and U.S. Route 2. |
Rejected | ||
| PH023615.05 | South Portland | Bridge Expansion Joint Fabrication: Located on I-295 Southbound, over Route 703. |
Awarded | ||
| 026903.00 | Hope | Culvert Replacement: Located on Route 235. |
Rejected | ||
| 023723.00 | Presque Isle | Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements: Located in Aroostook County, project is in Presque Isle on US Route 1 beginning 0.06 miles north of Westfield/Presque Isle town line, extending northerly 5.61 miles. |
Awarded | ||
| 023805.00 | Woolwich / Wiscasset | Hot Mix Asphalt Overlay with Drainage and Safety Improvement: Located in Sagadahoc and Lincoln Counties, project is located on US Route 1 beginning in Woolwich 0.25 of a mile north of Montsweag Road and extending north 3.89 miles. |
Awarded | ||
| 018834.00 | Machiasport | Large Culvert Rehabilitation: Located on the Port Road, approximately 0.40 mile north of the intersection of Base Road and Port Road. |
Awarded | ||
| 022646.00, 023775.01 | Abbot | Highway Reconstruction: Located on Route 6, beginning 0.40 mile north of the West Road and extends southerly 2.69 miles. |
Awarded | ||
| 018821.00 | Gorham | Large Culvert Replacement: Project is located on Route 25, beginning 0.41-mile northerly of State Street at Brandy Brook Bridge. |
Awarded | ||
| 021870.00 | Amherst | Half Mile Pond Brook Bridge Replacement: Located on Airline Road, on Route 9, approximately 3.6 miles easterly of Clifton town line. |
Awarded | ||
| PH023871.20WP | Regions 1,3,4 & 5 | White Painted Pavement Markings.
|
Awarded | ||
| 026299.00 | Byron / Townships of D & E | Culvert Replacements: Located on Route 17. |
Awarded | ||
| 018915.20 | Brewer | Wilson Street, I-395 Bridge Replacement: Located on Route 1A over Interstate 395, approximately 0.35 of a mile easterly of Dirigo Drive. |
Awarded | ||
| 018754.00 | Eliot | Wildlife Crossing Culvert: Located on Route 236, approximately 0.30 mile Southeasterly of the Depot Road. |
Awarded | ||
| 023635.00 | Waterville | North Street Bridge Wearing Surface Replacement: North Street Overpass bridge is located on North Street over Maine Central Railroad approximately 0.30 of a mile westerly of Main Street/Route 104 Junction. |
Awarded | ||
| 026339.00 | Strong | Culvert Replacement and Cleaning: Located in various locations along Route 149. |
Awarded | ||
| 022222.00 | Winthrop | Sidewalk and Safety Improvements: Project is located on Main Street, beginning 0.17-mile westerly of S.B. exit of Route 202, extending westerly 0.10 mile to Metcalf Road, continuing from Depot Street, and ending at Route 41. |
Awarded | ||
| 023571.00 | Augusta / Waterville / Winslow | Bridge Substructure Coating Projects in Kennebec County:
|
Awarded | ||
| 023617.30, 023679.00, 024221.00, 024787.00, 024789.00 | Medway / Sherman / Townships of T1 R6 WELS / Herseytown | Pavement Milling, Hot Mix Asphalt Overlay, Bridge Work, with Drainage and Safety Improvements:
|
Awarded | ||
| 023801.00 | Windham | Traffic Signals: Project is located at the Intersection of Route 202 with the Falmouth Road. |
Awarded | ||
| RFP024805.00 | Augusta | MaineDOT Pilot Solar Project: Located at the Augusta State Airport and I-95 exits 109 and 112 in Augusta.
|
Awarded |
