Archived Bid Opportunities

Bid Date WIN(s) Municipality Summary Status Date posted
PH20210623ER4 Region 4

On Call Electrical Services:

Various locations in the Counties of Washington, Hancock, Penobscot, Piscataquis and Somerset Counties.

Awarded to:

  • Hartt's Electric Service of Levant, Maine on August 12, 2021.
  • Donny Lee Electric Inc. DBA Bud Lee Electric of Sullivan, Maine on August 12, 2021.
  • Baker Electric and Sons of Bangor, Maine on August 12, 2021.
Awarded
018574.00 Biddeford

Intersection Improvements:

Located at the Intersection of Main Street, Water Street, and North Dam Mill entrance.

Rejected
024235.00 See Summary Below

Rumble Strip Installation:

Various locations Statewide as described in the bid documents.

Municipality:

Alfred / Arundel / Aurora / Blaine / Bridgewater / Brunswick / Cherryfield / Eddington / Edgecomb / Frankfort / Gouldsboro / Harrington / Houlton /Jonesboro / Littleton / Monticello / Newcastle / Pembroke / Prospect / Robbinston / Rockport / Topsham / Van Buren / and Waldoboro / Plantation of Baring / Cities of Calais /Caribou / Presque Isle

Awarded
PH022194.00 Rockland

State Ferry Vessel Replacement:

Located at the Maine State Ferry Service in Rockland, Maine.

Please Note: A Pre-Bid Conference was held on Tuesday, June 08, 2021. You can watch the recorded pre-bid conference video in lieu of attending the meeting and still bid.  See Bid Amendment #1.

Awarded
PH20210609MMW Tremont (Bass Harbor) / Lincolnville

Emergency Maintenance and Monitoring Wastewater Systems:

Located at the Maine State Ferry Service facilities in Bass Harbor and Lincolnville.

Awarded
PH20210609ADM Prospect / Verona Island - Region 4

Air Dryer System Maintenance:

Located at the Penobscot Narrows Bridge in Waldo and Hancock Counties.

  • Please Note: An optional site visit is scheduled for Tuesday, June 15, 2021, at the site located at Honders Drive on Verona Island,
    Maine, starting at 10:00 A.M.
Awarded
PH20210602OCM Statewide

On Call Mulching - Equipment Rental with an Operator.

Awarded to the following:

  •  Bulldog Land Management, Inc. of Saco, ME-Regions 1,2,3;
  • Comprehensive Land Technologies, Inc. of South China, ME-Regions 1,2,3,4,5;
  • Ellis Construction, Inc. of Farmingdale, ME-Regions 2,3;
  • Ground Perfection Specialists, Inc. of Presque Isle, ME-Regions 1,2,3,4,5;
  • Hawkes Tree Service of Phippsburg, ME-Regions 1,2,3,4,5;
  • Nathan O. Northrup Forest Products & Earthwork of Jefferson, ME-Regions 1,2,3,4,5;
  • Quality Hardwood/Custom Mowing of Newfield, NH-Regions 1,2,3,4;
  • TruView Mulching, Inc. of Bridgton, ME-Regions 1,2,3.
Awarded
025958.00 Montville

Instream, Wetland and Upland Culvert Replacements:

Located on Route 220 in Montville.

Awarded
PH021162.21 Medway

Median Overgrowth Restoration, Interstate 95 SB:

Work is located in Penobscot County, in the Town of Medway, in the median of Interstate 95 southbound from mile post 244 to mile post 243, starting at the end at crossover (45.600133, -68.531472) and ending at (45.595763, -68.537378).

Awarded
023667.00 Lewiston

Pavement Milling, Hot Mix Asphalt Overlay with Drainage Improvements:

Located on Sabattus Street, beginning 0.01 miles east of Main Street (Route 11) and extending east 2.09 to 0.01 miles east of Randall Road.

Rejected
020898.00 Orono

Large Culvert Replacement:

Located on Route 2, approximately 0.66 mile northerly of the Orono/Veazie town line.

Awarded
027051.00, 027053.00 Whitefield /Alna

Forestry and Canopy Clearing:

Located on Routes 194 and 218 in Whitefield and Alna.

Awarded
026987.00 Wilton

Culvert End Replacement:

Located on Route 2 in Wilton.

Rejected
022498.00, 023749.00 Alfred / Wells / Sanford

Pavement Milling, Cold in Place Recycling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:

  • 022498.00 is located on Route 109, beginning in Wells 0.15 miles south of Wire Road and extending northwest 4.71 miles to 0.21 miles southeast of Route 4, in Sanford.
  • 023749.00 is on US Route 202, beginning in Sanford 0.30 miles east of Junk Street and extending east 2.99 miles. 
Awarded
027323.00 Fort Fairfield

Truck Storage and Crew Quarters Building:

Located at the Fort Fairfield Maintenance Lot at 86 High Street.

Rejected
018880.00, 019400.00 Camden / Rockport

Sidewalk Construction:

  • 018880.00 is located on US. Route 1, beginning at the Quarry Hill Road in Camden and extending 1,950 feet to Commercial Street in Rockport.
  • 019400.00 is located on Washington Street (Route 105), beginning at the intersection of Mathew John Avenue and Extends 0.44 mile to Shirttail Point Road.
Awarded
PH20210505OCS Statewide

On Call Painted Pavement Markings:

Awarded to 

  • Lucas Striping, LLC of Readfield, Maine on June 8, 2021, for Regions 1,2,3 and 4 & MSFS Regions 2 & 4
  • K5 Corporation of Rockland, MA on July 12, 2021, Regions 1-5.
Awarded
024153.10, 024159.10 Northport / Rockport / Warren / Rockland

Drainage Improvements:

Project 024153.10 in Knox County, located on Route 90, beginning in Warren, 0.20 mile north of Mountain Road and extending north 7.18 miles.

Project 024159.10 in Waldo County, located on US route 1 in Northport, beginning 0.23 mile north of Pound Hill Road and extending north 2.70 miles.

Awarded
023476.00, 023480.00 Bass Harbor & Swans Island

Fender System Modifications, in Hancock County: Install Dolphins, Walkways, Wave Fences and other incidental work.

  • Project 023476.00 is located at Bass Harbor ferry terminal.
  • Project 023480.00 is located at Swans Island ferry terminal.
Awarded
PH024229.00B, PH024231.00B Statewide

Supply and Delivery of School Zone Signage and Rectangular Rapid Flashing Beacon Signs on a Two-Way Street (RRFB'S), and for Statewide Installation.

Delivered to MaineDOT facilities in Augusta.

Rejected
021657.01 Anson

Ice House Bridge Replacement:

Project is located on River Road/Route 8 & 201A over Gilman Brook, approximately 0.05 of a mile southerly of Campground Road.

Awarded
022962.00 Pownal

Intersection Improvements:

Project is located at the intersection of Elmwood Road and Hallowell Road.

Awarded
023442.21E Region 5

Excavators/Supply Excavators without operator for seasonal use by the Department.

Awarded
023559.00 Byron

Dugway Bridge Replacement:

Project is located on Swift River Road/Route 17 over Baldwin Brook, approximately 0.62 of a mile northerly of Garland Pond Road.

Awarded
PH018599.21H Statewide

Herbicide Application State Railroads.

Awarded
026957.00 Searsmont - Region 2

Instream Culvert Replacements:

Located on the New England Road/Route 131/and Route 173.

Awarded
022885.00 Houlton

Traffic Signal Improvements:

Located at the intersection of Route 1 and Route 2.

Rejected
023671.55L, 024169.55L Regions 1 & 5

Loaders & Supply Loaders without operator for seasonal use by the Department:

  • 026671.55L may be located at MaineDOT property at 185 Grindstone Road in Medway.
  • 024169.55L may be located at 107 Libby Road Pownal.
Awarded
023527.00, 024125.00, 024463.00 Beddington / Townships of: Devereux / T22 MD BPP / T24 MD BPP / T28 MD BPP / T30 MD BPP

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements:

  • 023527.00 is on Route 9, beginning in Beddington 0.20 of a mile south of the Devereaux TWP-Beddington town line & extending north 8.50 miles.
  • 024125.00 is located on Route 9, beginning in T22 MD BPP 0.38 of a mile east of Smith Ridge Road & extending northeast 3.40 miles.
  • 024463.00 is located on Route 9, beginning in T28 MD BPP 0.52 of a mile east of Back Road & extending southeast 2.49 miles.
     
Awarded
022861.00, 022863.00 Fort Kent

Intersection Improvements:

  • 022861.00 is located at the intersection of Route 1 and Route 11.
  • 022863.00 is located at the intersection of Route 1 and Route 161.
Rejected