Public Notice of Preliminary
Permit filed for Portsmouth River Tidal Project
The State of
Project Description:The Portsmouth Area Tidal Energy
Hydroelectric Project would consist of 50 to 100 tidal in-stream energy
conversion devices (TISEC) consisting of rotating propeller blades and
integrated generators with a capacity of 0.5 to 2.0 MW, anchoring systems,
mooring lines and interconnection transmission lines. The project is estimated
to have an annual generation of 8.76 gigawatt hours per unit per year which
would be sold to a local utility. A copy of the application can be viewed on
the Commission’s website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov or call 202-502-8659 or 202-502-8371. Individuals wishing to be included on the
FERC mailing list should indicate by writing to the Secretary of the Commission
at FERC,
Intervention/public comment:The deadline for filing
comments, protests and motions to Intervene is July 1, 2006. All documents
(original and eight copies) should be filed with: Magalie R. Salas, Secretary,
Federal Energy Regulatory Commission,
Contacts for additional information:FERC contact: Chris Yeakel,
(202)-502-8132, Chirs.Yeakel@ferc.gov ; Applicant Contacts: Joseph A.
Cannon, Pillsbury Winthrop Shaw Pittman LLP, 2300 N Street,
Review Process:A preliminary permit, if issued, does not authorize construction. The term of a preliminary permit is 36 months. The work proposed under a preliminary permit would include; economic analysis, preparation of preliminary engineering plans and studies of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the development of an application to construct and operate the project.
|
|