Skip First Level Navigation | Skip All Navigation
| MaineDOT | Contact Us |
|
|
Home > MaineDOT News Release Detail
News Release for September 11, 2012 Steep Falls Bridge RepairsLimington/Standish– Crews are performing repair work on the Steep Falls Bridge, connecting Limington and Standish today (Tue) and Wednesday, September 12th. Due to this project, there will be an alternating one-way traffic pattern over the bridge each day from 7 a.m. to 5 p.m., with flaggers assisting motorists through the area. Work on this steel bridge truss involves the strengthening of a corroded area. ### |
| Copyright MaineDOT © 2010 All rights reserved. |