Skip First Level Navigation | Skip All Navigation
| MaineDOT | Contact Us |
|
|
Home > MaineDOT News Release Detail
News Release for July 2, 2012 Sarah Mildred Long Bridge To Close For Safety RepairsKittery – The Sarah Mildred Long Bridge connecting Kittery, ME and Portsmouth, NH, will be closing nightly for safety repairs starting the night of July 5th, with completion slated for August 1st. Crews will be installing prefabricated steel barriers as a supplemental safety measure due to the corroded guardrail along the length of the bridge. The center lift span will have a temporary guardrail installed that will be mounted on steel posts. Detour signs and message boards will guide motorists on either end of the bridge to the alternate routes. This work, being performed by CPM Constructors of Freeport, will close the bridge to all traffic during the following days and times:
### |
| Copyright MaineDOT © 2010 All rights reserved. |