Skip First Level Navigation | Skip All Navigation
| MaineDOT | Contact Us |
|
|
Home > MaineDOT News Release Detail
News Release for July 6, 2010 Newcastle/Nobleboro Bridge Will be Reduced to one lane due to repairsMaineDOT bridge maintenance crews are set to begin repairs to the New Bridge on Route 215 on the Newcastle/Nobleboro town line. The New Bridge spans the outlet of Damariscotta Lake. Crews will be replacing the concrete travel surface of the bridge, which provides for a smoother ride while protecting the bridge substructure. During the construction, traffic will be limited to one lane of alternating one-way traffic regulated by “STOP” and “Proceed When Clear” signs. If there are no weather-related delays, the project is expected to be completed within six weeks. Motorists are asked to drive carefully through the construction zone. ### |
| Copyright MaineDOT © 2010 All rights reserved. |