Skip Maine state header navigation
|
Measure
# |
Measure
Name |
Change |
Reason
for Change |
All |
Any CLEC aggregate measure |
·
Exclude Verizon Affiliate Data from
CLEC aggregate performance ·
For xDSL Loops reference standard as
parity with SDA where using line sharing |
NY C2C |
|
PO-1 |
OSS Response Time (applies to all PO-1)
(applies to all interfaces) |
CLEC transactions will be actual production
times |
NY C2C
Actual production data was running consistent with EnView replicated
transactions. The Carrier Working
Group agreed that it was no longer necessary to replicate. Improves deliverable time for performance
measures. No scripting is
required. |
PO-1 |
OSS Response Time (applies to all PO-1) – WEB
GUI |
Add product disaggregation reporting for GUI
performance for PO-1-01 through PO-1-07.
Performance standard fixed at retail plus 7 seconds (except PO-1-04) |
NY C2C.
Requested by CLECs. Standard
to be longer due to differences between a GUI and a direct interface. |
|
PO-1 |
PO-1-01 through PO-1-09 |
Change hours reported from “8AM to 6PM” to
“8AM to 9PM.” |
NY C2C : Time frames should be consistent with
production response times for Parsed CSR. |
|
PO-1-04 |
Average Response Time – Product & Service
Availability |
Performance Standard changed to retail plus 10
seconds |
NY C2C |
|
PO-1-05 |
Average Response Time – Telephone Number
Availability & Reservation |
Reduced time-out limit to 60 seconds |
NY C2C |
|
PO-1-10 |
Parsed CSR – CLEC Total |
Metric deleted. |
With the shift from EnView to actual
production metrics in PO-1-09, metric PO-1-10 becomes redundant. |
|
PO-2 |
All |
Changed language to expand metric to cover
Ordering for EDI and Web GUI transactions specified in the definition. |
NY C2C:
Changed product disaggregation language to be consistent with the
definition. |
|
PO-2-02 |
OSS Availability – Prime Time |
Added exclusion for scheduled interface
outages for major releases |
NY C2C |
|
Measure
# |
Measure
Name |
Change |
Reason
for Change |
|
PO-4 |
Timeliness of Change Management Notice |
Modify standard for changes implemented on or
after July 1, 2000, 73 days for business rules, 66 days for technical specifications. |
NY C2C: Changed language so rules set forth in
C2C guidelines would be consistent with standards set in the change control
process. |
|
OR-1 |
Order Confirmation Timeliness |
Definition section ; Changed reference for
partial migrations from 10 lines to six (6) lines |
NY C2C: Changed language to be consistent with
order. |
|
OR-1 |
Order Confirmation Timeliness (all) Reject Timeliness (all) |
Modify line size disaggregation such that
facility checks will be completed for orders with more than 5 lines for several
sub-metrics. Changed name of
sub-metrics. % On Time LSRC (or reject) – No Facility Check and % On Time
LSRC (or reject) – Facility Check |
NY C2C: Verizon Retail performs a facility
check when there are more than 5 lines on an order. Discussions with several CLECs indicate that it would be
preferred if Verizon performed the facility check in advance of providing a
due date. This enables Verizon to
provide a better due date, improving customer service. |
OR-1 |
Order Confirmation Timeliness (all) for 2 wire
Digital and 2 wire xDSL services |
Add exclusion for orders requiring loop
conditioning. |
New issue to be addressed via C2C. Order
confirmation (with real due date) is provided upon completion of conditioning
and will not be within existing intervals. |
|
OR-1 OR-2 |
·
Order Confirmation Timeliness ·
Reject Timeliness (all) |
·
Clarified language that performance is
based upon orders confirmed/rejected in the month. ·
Added clarifying language with respect to Pre-Qualified complex ·
Performance standard: Added the word “manual” to requiring loop
qualification. Provides a separate
specified standard for line sharing. |
NY C2C.
Language clarification requested by PWC auditing team. Provides a clearer description. |
|
OR-1 OR-2 |
·
Order Confirmation Timeliness ·
Reject Timeliness |
Disaggregated
UNE POTS/Pre-qualified Complex to
Loop and Platform |
NY C2C |
|
Measure
# |
Measure
Name |
Change |
Reason
for Change |
|
OR-1 OR-2 |
·
Order Confirmation Timeliness ·
Reject Timeliness |
Remove product disaggregation for Resale 2Wire
xDSL services |
NY C2C:
Verizon no longer resells 2Wire xDSL services. This service is provided by the separate
data affiliate. |
|
OR-1-02 OR-2-02 |
·
% on Time LSRC – Flow Through ·
% on Time LSR Reject – Flow Through |
Add exclusion for expansion scheduled SOP time
during major releases |
NY C2C |
|
OR-1-04 OR-2-04 |
·
% On Time LSRC/ASRC < 6 Lines
(Electronic No flow through) ·
% On time LSR/ASR Reject < 6 Lines
(Electronic No Flow through) |
·
Changed line size breakout to < 6
from < 10 ·
Added ASR to name |
NY C2C |
|
OR-1-06 OR-2-06 |
·
% On Time LSRC/ASRC ³ 6 Lines
(Electronic) ·
% On Time LSR/ASR Reject ³ 6 Lines
(Electronic) |
·
Changed line size breakout to ³ 6 from ³ 10 ·
Added ASR to name |
NY C2C |
|
OR-1, OR-2, OR-3, OR-4, and OR-5 |
·
Order Confirmation Timeliness ·
Reject Timeliness ·
Percent Rejects ·
Timeliness of Completion Notification ·
Percent Flow-Through |
·
Notes in Definition section
changed. Removed the word “completed”
before PON Master file |
The PON master file includes more than
completed orders, and is known as just the PON Master File. |
|
OR-1, OR-2, PR-1, and PR-3 |
·
Order Confirmation Timeliness ·
Reject Timeliness ·
Average Interval Offered ·
Completed within specified number of
days |
Performance standard: Added reference to Appendix L and
web-site. |
NY C2C Compliance Filing |
|
OR-2 |
·
Reject Timeliness |
·
Exclusions: Eliminated “orders that are not completed or cancelled” from
the language |
Language should have been removed in earlier
version of Guidelines consistent with earlier NY PSC order to report
confirmations in the month they occur.
Performance is reported on a transaction basis. |
Measure # |
Measure Name
|
Change |
Reason
for Change |
|
OR-3-01 |
·
% Rejects |
·
Numerator and Denominator; Removed
unclear language from PON Master File. |
Language was unclear, and did not add value to
the performance metric. |
|
OR-4 |
·
Timeliness of Completion Notification |
·
Eliminate EIF from definition
section. ·
Exclusions: Removed Reference to order
completion time in the billing system. ·
Performance Standard: Removed note for
CLEC availability for testing on the due date. |
·
NY C2C: EIF is no longer an interface provided by Verizon ·
Removed language because OR-4-03 was
deleted. ·
Language references hot cut performance
and was not relevant to OR-4 metrics. |
|
OR-4-03 |
·
% Orders excluded from % On Time
Measurement |
·
Delete sub-metric |
NY C2C: With the conversion to transaction
based performance reporting, this exclusion is no longer applicable or
relevant. The sub-metric data would
always be 0. |
|
OR-4-11 through OR-4-15 |
% Completed orders without etiher a PCN or BCN % Due Date to PCn within 2 Business Days % Due Date to PCN within 5 Business Days % Due Date to BCN within 4 Business Days % Due Date to BCN within 7 Business Days |
·
Add five new metrics |
NY C2C:
Verizon believes that the area of completion notification metrics is
worth continuing to discuss in the carrier working group – including the
possibility of removing some additional outdated measures and including some
of these new ones in their place. |
|
OR-5 |
% Flow Through |
·
Add exclusion for Verizon separate data
affiliate ·
Delete special affidavit exclusions |
NY C2C:
CLEC aggregate performance should only reflect CLEC performance,
without such specific exclusion, Verizon would include SDA performance. |
Measure # |
Measure Name |
Change |
Reason for Change |
|
OR-7 |
% Order Confirmation / Rejects sent within
three business days |
·
New Metric and standard |
FCC consent decree meeting. |
|
OR-8 OR-9 |
Acknowledgement Timeliness Acknowledgement Completeness |
·
New metrics and standards |
Verzion and AT&T agreed upon metric and
standard in NJ proceeding. |
|
PR-1 |
Average Interval Offered |
·
Definition section: Added the words
“for completed and cancelled orders.” ·
Exclusions: Changed language to orders that have neither been completed nor
cancelled ·
Exclusions: Added exclusion to clarify that disconnects are excluded from
all metrics except measure of disconnect orders |
PR-1 includes both cancelled and completed
orders. Language change makes it
clearer. |
|
PR-1 PR-2 |
Average Interval Offered Average Interval Completed |
·
In performance standard, change
reference to interval guide to refer to the Verizon web-site |
NY C2C:
Change was previously ordered by NY PSC, but inadvertently omitted
from the prior Verizon filing. |
|
PR-1-10 PR-1-11 |
Average Interval Offered – Disconnects – No
Dispatch Average Interval Offered – Disconnects –
Dispatch |
·
Changed Metric PR-1-10 number to
PR-1-12, and modified it to include all disconnects ·
Delete PR-1-11 |
·
NY C2C: Verizon does not dispatch for all disconnected services. The performance should be reported on a
combined basis. ·
Re: metric # change: with change in
metric definition, this created a metric conflict and a new number was
assigned via metrics change control. |
|
PR-1, PR-2 and PR-3 |
·
Average Interval Offered ·
Average Interval Completed Completed within Specified number of Days (1-5
lines) |
·
Clarified business day cut off of 5PM |
Language clarification |
Measure # |
Measure
Name |
Change |
Reason
for Change |
|
PR-2 |
Average Interval Completed |
·
Delete sub-metrics PR-2-14, 2-15, 2-16,
2-17 and 2-18 ·
Delete sub-metric PR-2-13 ·
Changed metric 2-10 to 2-18 |
·
NY C2C: The separate reporting of this
performance has the effect of providing CLEC specific data due to the nature
of the process the particular CLEC follows.
·
Deleted 2-13 because metric is already
reported under PR-2-02. ·
With change in metric definition this
created a metric conflict and a new number was assigned via metrics change
control. |
|
PR-3-10 |
% Completed within 6 days |
Removed the retail compare group – standard is
95% Exclude 2W Digital and 2W xDSL orders which
require a manual loop qualification from the % Completed within six days
measure. Exclude any order with a
requested interval > than 6 days.
Exclude facility misses. |
Orders which require a manual loop qual will
not be completed within the specified days because time has to be added on to
complete the manual loop qual process.
|
|
PR-3-03 PR-3-07 PR-3-08 PR-3-09 |