| 91-02 |
Crack
Sealing Before Overlaying an Asphalt Concrete Surface
|
| 92-34 |
Field
Trial of Gravel Stabilization Methods- Route 1, Cyr /Van Buren
|
95-02 |
Experimental
Use of Reinforcing Membrane and Grid on Thermal Cracks of
HMA for Reflective Cracking Control
|
|
Longitudinal
Joint Study
|
|
Experimental Use of Sawed and Sealed Joints to Minimize Thermal
Cracking of HMA
|
|
An
Evaluation of Winter Maintenance Material Metering and Placement
Equipment-Final Report
|
| 97-20 |
Subsurface
Drainage for Rehabilitation of PCC Pavement
|
| 97-21 |
Saw & Seal, Airport Pavement
|
| 98-02 |
ARAN/GIS
Integration
|
98-03 |
Potential
Benefits of Adding Emulsion to Reclaimed Base Material
|
| 98-08 |
Experimental
Utilization of Permeable Base
|
| 99-05A |
Fast
Ferry Operations & Issues-Phase 2 |
|
Experimental
Use of GeoGrids as an Alternative to Gravel Placement
|
| 99-11 |
Innovative
Solutions to Buried Portland Cement Concrete Roadways
|
| 00-02 |
Pedestrian
Safety in Maine Executive
Summary |
| 00-08 |
Utility
Pole Crash Modeling
|
| 00-18 |
Longitudinal
Joint Treatment
|
|
Comparison
of "Saw and Seal" Procedure and
Performance
Grade Binder to Minimize Thermal Cracking
|
| 00-20 |
Experimental
Utilization of Tire Shreds to Enhance Highway Drainage
|
| 01-02 |
Evaluation of the Norridgewock Intersection Collision Avoidance Warning System on Route 201A, Norridgewock, Maine
|
| 01-03 |
Experimental
Installation of Geosynthetic Reinforcement to
Reduce
Reflective Cracking
|
| 01-07 |
Monitoring a Pile-Supported Integral Abutment Bridge at a Site
with Shallow Bedrock - Phase II |
| 01-11 |
Traffic
Signal Safety - Analysis of Red-Light Running in Maine
|
|
Evaluation
of Radar Activated Changeable Message Sign for Work Zone Speed
Control |
| 02-02 |
Using
Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation
of Route 8 in Belgrade
|
| 02-03 |
The
Use of Micro-Surfacing for Pavement Preservation
|
|
Bridge
Deck Resurfacing Using Rosphalt 50
|
| 03-02 |
Experimental
Placement of Stone Matrix Asphalt (SMA) Court St., Auburn
|
| 03-03 |
Comparison
Test of Liquid Calcium and Salt Brine |
| 03-09 |
Shoulder
Rehabilitation Using Portland Cement and
Recycled
Asphalt Pavement
|
| 03-10 |
Experimental
Use of Self Consolidating Concrete for
Precast Prestressed Box Beams |
| 03-11 |
Field
Testing of Alternative Carbide Edge Snow Plow Blades
|
| 03-12 |
Experimental
Placement of Stone Matrix Asphalt- Route 1, South
|
| 03-13 |
Evaluation
of a Radar Activated Speed Warning Sign
for
School Zone Speed Control |
| 04-01 |
Alternative Shallow Cross Pipe Installation Methods
|
| 04-01A |
Analysis of Pavement Response Data and Use of Nondestructive Testing for Improving Pavement Design
|
| 04-05 |
Evaluation
of Transit Route Development: A Case Study of Downeast Transportation
Inc.'s Bucksport, Maine Bus Route |
| 04-06 |
Comparison Tests of Deicing
Liquids on Snow Plow
Routes in Northern Maine |
| 05-01 |
Evaluation of the Schmidt-STRATOS Spreader |
| 05-06 |
Full Depth Reclamation with Cement along Rt. 2A in Reed Plantation
|
| 05-07 |
Utilizing a Hot Applied Snowmobile Crossing Mat to Eliminate HMA Abrasion
|
| 05-08 |
Utilizing Lignosulfates for Gravel Shoulder Stabilization
|
| 06-01 |
Field testing of a Low-Cost Retrofit Filter Berm to Treat Stormwater Runoff and Reduce Non-Point Source Contaminants |
| 06-02 |
A Before-and-After Study of Traffic Conflicts at the U. S.
Route One Entrance to Camden Hills State Park-
An Evaluation of a Portion of a Context Sensitive Design
Project |
| 06-06 |
Problem Solving -
Documentation of Liquid De-icing Agents Utilized
During the Winter of 2005-2006 |
| 06-13 |
Guidelines for the Use of Ground Penetrating Radar (GPR) and Portable Seismic Property Analyzer (PSPA) in Full Depth Reclamation Projects
|
| 06-14 |
FRP-Wood Hybrid Bridge Deck in Union-Washington, Skidmore Bridge - Final Report NEW! |
| 07-01 |
Evaluation of 6 Modified Salt Spreaders |
| 07-03 |
Utilizing Snap-Tite Slip Line Pipe as a Direct Burial Cross Pipe
|
| 08-01 |
Mechanistic Approach to Determine Spring
Load Restrictions in Maine
|
| 08-02 |
Can Maine Metropolitan Planning Organizations (MPOs) Finance Transportation Projects through Bond Financing?
|
| 08-03 |
Employee Wellness Program Evaluation |
| 08-04 |
Comparison of Observed and Predicted Abutment Scour at Selected Bridges in Maine - Final Report NEW! |
| 08-12 |
Field Evaluation of Automated Flagger Assistance Devices
|
| 08-13 |
Field Test of a Polyphosphoric Acid (PPA) Modified Asphalt Binder on Rt. 1 in Perry
|
| 09-01 |
A Winter Severity Index for the State of Maine - Technical Report |
| 09-02 |
Evaluation of the Assaloni Plow and Material Spreader - Technical Report |
| 09-03 |
Evaluation of Alternative Snow Plow Cutting Edges |
| 09-04 |
Evaluation of the Viking-Cives Tow Plow |
| 09-05 |
Evaluation of the Monroe Slurry Maker - Technical Brief
|
| 09-06 |
Inspection of the Advanced Engineered Lumber Railroad Ties at the New Meadows Bridge - Final Report NEW! |
| 09-07 |
Design, Construction and Testing of the Neal Bridge in Pittsfield, Maine - Final Report NEW! |
| 09-08 |
Temporary Bridge Deck Panels - Final Report NEW! |
| 09-09 |
Laser Welded Steel Sandwich Panel Bridge Deck Development: Finite Element Analysis and Stake Weld Strength Tests - Final Report NEW! |