Highway Research Reports (Projects Initiated Before 2000)
Return to Highway Projects Initiated from 2000 to Present
Highway Research Reports
- 91-02: Crack Sealing Before Overlaying an Asphalt Concrete Surface
Final Report (PDF)
- 91-30: Evaluation of A588 Weathering Steel Guardrail Lap Splices
Technical Report (PDF)
- 92-34: Field Trial of Gravel Stabilization Methods- Route 1, Cyr/Van Buren (PDF)
Construction | 1993 | 1995 | 1996 | 1997 | 1998 | 2000 | 2003 | 2004 | Final
- 95-02: Experimental Use of Reinforcing Membrane and Grid on Thermal Cracks of HMA for Reflective Cracking Control
Interim Report 1999 (PDF)
- 96-02: Longitudinal Joint Study
Final Report (PDF)
- 96-25 & 97-19: Experimental Use of Sawed and Sealed Joints to Minimize Thermal Cracking of HMA (PDF)
1999 | 2001 | 2002 | Final Report
- 97-20: Subsurface Drainage for Rehabilitation of PCC Pavement (PDF)
2002 | Final Report
- 98-02: ARAN/GIS Integration
Final Report (PDF)
- 98-03: Potential Benefits of Adding Emulsion to Reclaimed Base Material (PDF)
1999 | 2001 | 2003 | Final
- 98-08: Experimental Utilization of Permeable Base (PDF)
Construction | 2007
- 99-08: Experimental Use of GeoGrids as an Alternative to Gravel Placement (PDF)
2000 | 2002 | 2004 | Final Report
- 99-11: Innovative Solutions to Buried Portland Cement Concrete Roadways (PDF)
Construction | 2000 | 2001 | 2003 | 2004 | Final Report
This page last updated on
11/30/10