Highway Research Reports

Projects Initiated Before 2000

Archived Research Reports

Projects Initiated from 2000 to Present

  • 00-18: Longitudinal Joint Treatment (PDF)

Construction | 2000  | 2001 | 2004 | 2005 | Final Report

  • 00-19: Comparison of "Saw and Seal" Procedure and Performance Grade Binder to Minimize Thermal Cracking (PDF)

Construction | 2002 | July 2004 | December 2004 | Final Report

  • 00-20: Experimental Utilization of Tire Shreds to Enhance Highway Drainage (PDF)

Construction | 2001 | 2003

  • 01-03: Experimental Installation of Geosynthetic Reinforcement to Reduce Reflective Cracking (PDF)

Construction | Final Report

  • 02-02: Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade (PDF)

Construction | 2003 | 2005 | 2006 | Final Report

  • 02-03: The Use of Micro-Surfacing for Pavement Preservation (PDF)

Construction | 2004 | 2005 | Final Report

  • 03-02: Experimental Placement of Stone Matrix Asphalt (SMA) Court St., Auburn

Interim Report 2003 (PDF)

  • 03-09: Shoulder Rehabilitation Using Portland Cement and Recycled Asphalt Pavement (PDF)

Construction | Final Report

  • 03-12: Experimental Placement of Stone Matrix Asphalt- Route 1, South

Construction Report (PDF)

  • 04-01: Alternative Shallow Cross Pipe Installation Methods

Technical Report (PDF)

  • 04-01A: Analysis of Pavement Response Data and Use of Nondestructive Testing forImproving Pavement Design

Interim Report 2006 (PDF)

  • 05-06: Full Depth Reclamation with Cement along Rt. 2A in Reed Plantation (PDF)

Construction | 2008 | 2009 

  • 05-07: Utilizing a Hot Applied Snowmobile Crossing Mat to Eliminate HMA Abrasion (PDF)

Construction | 2008 | Final Report

  • 05-08: Utilizing Lignosulfonates for Gravel Shoulder Stabilization

Construction and Interim Report 2007 (PDF)

  • 06-01: Field testing of a Low-Cost Retrofit Filter Berm to Treat Stormwater Runoff and Reduce Non-Point Source Contaminants

Final Report (PDF)

  • 06-02: A Before-and-After Study of Traffic Conflicts at the U. S. Route One Entrance to Camden Hills State Park- An Evaluation of a Portion of a Context Sensitive Design Project

Technical Report (PDF)

  • 06-13: Guidelines for the Use of Ground Penetrating Radar (GPR) and Portable Seismic Property Analyzer (PSPA) in Full Depth Reclamation Projects

Final Report (PDF)

  • 07-03: Utilizing Snap-Tite Slip Line Pipe as a Direct Burial Cross Pipe (PDF)

Construction Report | 2009

  • 08-01: Mechanistic Approach to Determine Spring Load Restrictions in Maine

Final Report (PDF)

  • 08-13: Field Test of a Polyphosphoric Acid (PPA) Modified Asphalt Binder on Rt. 1 in Perry

Construction and Interim Report 2009 (PDF) | Second Interim 2012 (PDF)      

  • 09-10: Experimental Demonstration of Warm Mix Asphalt Pavement on Rt. 4    

Construction and First Interim Report 2011 (PDF)

  • 10-05: Performance of a Porous Pavement System on the Maine Mall Road in South Portland 

Construction and First Interim Report 2010 (PDF)

  • 11-02: NovaChip Pilot Project - Route 5, Waterboro, Brownfield, & Fryeburg  

Construction Interim Report 2010 (PDF)

  • 12-01: Three Projects Using 4.75 mm Superpave HMA on Route 1A, Route 2A, & Route 27

Construction Report 2012 (PDF)

  • 12-02: Use of Warm Mix Asphalt Pavement along Rt. 27 in the towns of Farmington and New Portland

Construction and First Interim Report 2012 (PDF)

  • 12-04: Use of Warm Mix Asphalt Pavement on Route 9, in Durham

Construction and First Interim Report 2012 (PDF)

  • 12-06: Durability Assessment of Coarse Aggregates for HMA in Maine

Technical Report 2012 (PDF)

  • 12-07: Longitudinal Pavement Joint Performance: A Field Study of Infrared Heated and Notched Wedge Joint Construction

Construction Report 2012 (PDF)

  • 12-08: Use of Moisture Induced Stress Testing to Evaluate Stripping Potential of Hot Mix Asphalt (HMA)

Technical Report 2012 (PDF)

  • 13-02: Post-Tensioned Carbon Fiber Composite Cable (CFCC), Little Pond Bridge, Route 302, Fryeburg, Maine

Technical Report 2013 (PDF)

 

 

 

This page last updated on 6/17/13