Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

Highway Research Reports

Projects Initiated from 2000 to Present

  • 09-10: Experimental Demonstration of Warm Mix Asphalt Pavement on Rt. 4    

Construction and First Interim Report 2011 (PDF)

  • 10-05: Performance of a Porous Pavement System on the Maine Mall Road in South Portland 

Construction and First Interim Report 2010 (PDF)

  • 11-02: NovaChip Pilot Project - Route 5, Waterboro, Brownfield, & Fryeburg (PDF) 

Construction Interim Report 2010 | 2013

  • 12-01: Three Projects Using 4.75 mm Superpave HMA on Route 1A, Route 2A, & Route 27

Construction Report 2012 (PDF)

  • 12-02: Use of Warm Mix Asphalt Pavement along Rt. 27 in the towns of Farmington and New Portland

Construction and First Interim Report 2012 (PDF)

  • 12-04: Use of Warm Mix Asphalt Pavement on Route 9, in Durham

Construction and First Interim Report 2012 (PDF)

  • 12-06: Durability Assessment of Coarse Aggregates for HMA in Maine

Technical Report 2012 (PDF)

  • 12-07: Longitudinal Pavement Joint Performance: A Field Study of Infrared Heated and Notched Wedge Joint Construction

Construction Report 2012 (PDF)

  • 12-08: Use of Moisture Induced Stress Testing to Evaluate Stripping Potential of Hot Mix Asphalt (HMA)

Technical Report 2012 (PDF)

  • 13-03: Field Test of a Polyphosphoric Acid (PPA) Modified Asphalt Binder on Rt. 1 in Perry

Final Report 2013 (PDF)

  • 13-05: Use of JOINTBOND® as a Center Line Joint Stabilizer Demonstration

on I-95 N.B., Waterville to Clinton, Maine

Technical Report 2013 (PDF)

 

 

 

This page last updated on 6/10/14

free document readers

If your web browser or screen reader cannot view the documents that are listed on this page, please visit the Contact Page.