Highway Research Reports
Projects Initiated Before 2000
Archived Research Reports
Projects Initiated from 2000 to Present
- 00-18: Longitudinal Joint Treatment (PDF)
Construction | 2000 | 2001 | 2004 | 2005 | Final Report
- 00-19: Comparison of "Saw and Seal" Procedure and Performance Grade Binder to Minimize Thermal Cracking (PDF)
Construction | 2002 | July 2004 | December 2004 | Final Report
- 00-20: Experimental Utilization of Tire Shreds to Enhance Highway Drainage (PDF)
Construction | 2001 | 2003
- 01-03: Experimental Installation of Geosynthetic Reinforcement to Reduce Reflective Cracking (PDF)
Construction | Final Report
- 02-02: Using Foamed Asphalt as a Stabilizing Agent in Full Depth Reclamation of Route 8 in Belgrade (PDF)
Construction | 2003 | 2005 | 2006 | Final Report
- 02-03: The Use of Micro-Surfacing for Pavement Preservation (PDF)
Construction | 2004 | 2005 | Final Report
- 03-02: Experimental Placement of Stone Matrix Asphalt (SMA) Court St., Auburn
Interim Report 2003 (PDF)
- 03-09: Shoulder Rehabilitation Using Portland Cement and Recycled Asphalt Pavement (PDF)
Construction | Final Report
- 03-12: Experimental Placement of Stone Matrix Asphalt- Route 1, South
Construction Report (PDF)
- 04-01: Alternative Shallow Cross Pipe Installation Methods
Technical Report (PDF)
- 04-01A: Analysis of Pavement Response Data and Use of Nondestructive Testing forImproving Pavement Design
Interim Report 2006 (PDF)
- 05-06: Full Depth Reclamation with Cement along Rt. 2A in Reed Plantation (PDF)
Construction | 2008 | 2009
- 05-07: Utilizing a Hot Applied Snowmobile Crossing Mat to Eliminate HMA Abrasion (PDF)
Construction | 2008 | Final Report
- 05-08: Utilizing Lignosulfonates for Gravel Shoulder Stabilization
Construction and Interim Report 2007 (PDF)
- 06-01: Field testing of a Low-Cost Retrofit Filter Berm to Treat Stormwater Runoff and Reduce Non-Point Source Contaminants
Final Report (PDF)
- 06-02: A Before-and-After Study of Traffic Conflicts at the U. S. Route One Entrance to Camden Hills State Park- An Evaluation of a Portion of a Context Sensitive Design Project
Technical Report (PDF)
- 06-13: Guidelines for the Use of Ground Penetrating Radar (GPR) and Portable Seismic Property Analyzer (PSPA) in Full Depth Reclamation Projects
Final Report (PDF)
- 07-03: Utilizing Snap-Tite Slip Line Pipe as a Direct Burial Cross Pipe (PDF)
Construction Report | 2009
- 08-01: Mechanistic Approach to Determine Spring Load Restrictions in Maine
Final Report (PDF)
- 08-13: Field Test of a Polyphosphoric Acid (PPA) Modified Asphalt Binder on Rt. 1 in Perry
Construction and Interim Report 2009 (PDF) | Second Interim 2012 (PDF)
- 09-10: Experimental Demonstration of Warm Mix Asphalt Pavement on Rt. 4
Construction and First Interim Report 2011 (PDF)
- 10-05: Performance of a Porous Pavement System on the Maine Mall Road in South Portland
Construction and First Interim Report 2010 (PDF)
- 11-02: NovaChip Pilot Project - Route 5, Waterboro, Brownfield, & Fryeburg
Construction Interim Report 2010 (PDF)
- 12-01: Three Projects Using 4.75 mm Superpave HMA on Route 1A, Route 2A, & Route 27
Construction Report 2012 (PDF)
- 12-02: Use of Warm Mix Asphalt Pavement along Rt. 27 in the towns of Farmington and New Portland
Construction and First Interim Report 2012 (PDF)
- 12-04: Use of Warm Mix Asphalt Pavement on Route 9, in Durham
Construction and First Interim Report 2012 (PDF)
- 12-06: Durability Assessment of Coarse Aggregates for HMA in Maine
Technical Report 2012 (PDF)
- 12-07: Longitudinal Pavement Joint Performance: A Field Study of Infrared Heated and Notched Wedge Joint Construction
Construction Report 2012 (PDF)
- 12-08: Use of Moisture Induced Stress Testing to Evaluate Stripping Potential of Hot Mix Asphalt (HMA)
Technical Report 2012 (PDF)
- 13-02: Post-Tensioned Carbon Fiber Composite Cable (CFCC), Little Pond Bridge, Route 302, Fryeburg, Maine
Technical Report 2013 (PDF)
This page last updated on
6/17/13