Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

Bridge Research Reports

  • 01-07: Monitoring a Pile-Supported Integral Abutment Bridge at a Site with Shallow Bedrock - Phase I

Technical Report (PDF)

  • 01-07: Monitoring a Pile-Supported Integral Abutment Bridge at a Site with Shallow Bedrock - Phase II

Technical Report (PDF)

  • 03-01: Bridge Deck Resurfacing Using Rosphalt 50 (PDF)

Construction | 2004 | 2006 | Final Report

  • 03-10: Experimental Use of Self Consolidating Concrete for Precast Prestressed Box Beams

Technical Memorandum (PDF)

  • 06-14: FRP-Wood Hybrid Bridge Deck in Union-Washington, Skidmore Bridge

Final Report (PDF)  

  • 08-04: Comparison of Observed and Predicted Abutment Scour at Selected Bridges in Maine

Final Report (PDF)  

  • 09-06: Inspection of the Advanced Engineered Lumber Railroad Ties at the New Meadows Bridge

Final Report (PDF)  

  • 09-07: Design, Construction and Testing of the Neal Bridge in Pittsfield, Maine

Final Report (PDF)  

  • 09-08: Temporary Bridge Deck Panels

Final Report (PDF)  

  • 09-09: Laser Welded Steel Sandwich Panel Bridge Deck Development: Finite Element Analysis and Stake Weld Strength Tests

Final Report (PDF)  

  • 10-03: Culvert Rehabilitation and Invert Lining using Fiber Reinforced Polymer (FRP) Composites

Technical Report (PDF) 

This page last updated on 11/15/10

free document readers

If your web browser or screen reader cannot view the documents that are listed on this page, please visit the Contact Page.