Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

Bridge Research Reports

  • 08-04: Comparison of Observed and Predicted Abutment Scour at Selected Bridges in Maine

Final Report (PDF)

  • 09-06: Inspection of the Advanced Engineered Lumber Railroad Ties at the New Meadows Bridge

Final Report (PDF)

  • 09-07: Design, Construction and Testing of the Neal Bridge in Pittsfield, Maine

Final Report (PDF)

  • 09-08: Temporary Bridge Deck Panels

Final Report (PDF)

  • 09-09: Laser Welded Steel Sandwich Panel Bridge Deck Development: Finite Element Analysis and Stake Weld Strength Tests

Final Report (PDF)

  • 10-03: Culvert Rehabilitation and Invert Lining using Fiber Reinforced Polymer (FRP) Composites

Technical Report (PDF) 

  • 13-01: Experimental Use of Line-X® Coated Steel Pipe Piles, Clay Hill Bridge (#2157) Replacement Project over the Mousam River, Route 9/Western Avenue, Kennebunk, Maine

Technical Report (PDF)

  • 13-02: Post-Tensioned Carbon Fiber Composite Cable
    (CFCC), Little Pond Bridge, Route 302, Fryeburg, Maine

Technical Report (PDF)

  • 14-01: Development and Evaluation of Pile "High Strain Dynamic Test Database" to Improve Driven Capacity Estimates, Phase 1

Technical Report (PDF)

  • 14-01: Development and Evaluation of Pile "High Strain Dynamic Test Database" to Improve Driven Capacity Estimates, Phase 2

Technical Report (PDF)

  • 14-02 Bridge-in-a-Backpack™, Task 1: Investigation of Span lengths up to 70 Feet

Final Report (PDF)

  • 14-03 Bridge-in-a-Backpack™, Task 2: Reduction of costs through design modifications and optimization

Final Report (PDF)

  • 14-04 Bridge-in-a-Backpack™, Task 3: Investigation of Durability Enhancements Relative to Abrasion from Ice and other Sources

Final Report (PDF)

  • 14-05 Cost-Efficient and Storm Surge-sensitive Bridge Design for Coastal Maine

Final Report (PDF)

  • 14-06 Advanced Bridge Safety Initiative, Task 1: Development of Improved Analytical Load Rating Procedures for Flat-Slab Concrete Bridges - A Thesis Guidelines

Final Report (PDF)

  • 14-07 Advanced Bridge Safety Initiative, Task 3: Slab Bridge Load Rating using AASHTO Methodology and Finite Element Analysis - An Analysis of 20 Bridges & Guidelines

Final Report (PDF)

  • 14-08 Advanced Bridge Safety Initiative, FRP Flexural Retrofit for Concrete Slab Bridges - Task 4: Deliverables

Final Report (PDF)

  • 14-09 Advanced Bridge Safety Initiative, Recommended Practices for Live Load Testing of Existing Flat-Slab Concrete Bridges - Task 5

Final Report (PDF)

  • 14-10 Analysis of Projected Replacement and Costs for Potential Aquatic Barriers maintained by MaineDOT

Final Report (PDF)

  • 14-11 Advanced Bridge Safety Initiative - Live Load Testing and Load Rating of the Evans Brook Bridge (#5506) and the Hastings Bridge (#5507) in Batchelders Grant, Maine

Technical Report (PDF)

  • 14-12 Advanced Bridge Safety Initiative - Investigation of Floor Beam Performance in Three Steel Through-Truss Bridges - Task 7

Technical Report (PDF)

  • 14-13 Live Load Testing and Load Rating of Five Reinforced Concrete Bridges

Technical Report (PDF)

  • 14-14 Splicing and Local Reinforcement of Concrete Filled FRP Tubes

Technical Report (PDF)

  • 14-15 Manning's Roughness Coefficient for Buried Composite Arch Bridges

Technical Report (PDF)

 

This page last updated on 12/18/14

free document readers

If your web browser or screen reader cannot view the documents that are listed on this page, please visit the Contact Page.