Bridge Research Reports
- 01-07: Monitoring a Pile-Supported Integral Abutment Bridge at a Site with Shallow Bedrock - Phase I
Technical Report (PDF)
- 01-07: Monitoring a Pile-Supported Integral Abutment Bridge at a Site with Shallow Bedrock - Phase II
Technical Report (PDF)
- 03-01: Bridge Deck Resurfacing Using Rosphalt 50 (PDF)
Construction | 2004 | 2006 | Final Report
- 03-10: Experimental Use of Self Consolidating Concrete for Precast Prestressed Box Beams
Technical Memorandum (PDF)
- 06-14: FRP-Wood Hybrid Bridge Deck in Union-Washington, Skidmore Bridge
Final Report (PDF)
- 08-04: Comparison of Observed and Predicted Abutment Scour at Selected Bridges in Maine
Final Report (PDF)
- 09-06: Inspection of the Advanced Engineered Lumber Railroad Ties at the New Meadows Bridge
Final Report (PDF)
- 09-07: Design, Construction and Testing of the Neal Bridge in Pittsfield, Maine
Final Report (PDF)
- 09-08: Temporary Bridge Deck Panels
Final Report (PDF)
- 09-09: Laser Welded Steel Sandwich Panel Bridge Deck Development: Finite Element Analysis and Stake Weld Strength Tests
Final Report (PDF)
- 10-03: Culvert Rehabilitation and Invert Lining using Fiber Reinforced Polymer (FRP) Composites
Technical Report (PDF)
This page last updated on
11/15/10