Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

This is the I-295 Northbound Project Logo

Maine Mall Area Road Work

Maine Mall Road Reconstruction
2009 Construction Season


Long Creek - Photo Courtesy of So. Portland Land Trust The Maine Department of Transportation is reconstructing a portion of Maine Mall Road during the 2009 construction season. This project, funded by the American Recovery and Reinvestment Act of 2009 (Stimulus), involves a portion of Maine Mall road between Philbrook Avenue and the Maine Mall entrance south of Gorham Road. The project features the first application of a porous paving system on a high-volume public road in the Northeast. With its porous surface, rain and snowmelt pass through to the gravel-and-sand filtering system below, reducing pollution of surface water bodies such as Long Creek.


This page last updated on 8/31/09