Skip Maine state header navigation
Skip First Level Navigation | Skip All Navigation
| MaineDOT | Home | Contact Us |
Site Map |
|
south bristol gut bridge project |
Home
>Public Process
Public ProcessMaineDOT has been working with South Bristol since 2009 and, together, developed specific criteria to guide the design of the bridge. The new bridge should:
Based on these parameters, as well as initial and life-cycle costs, a European/Dutch style Heel Trunnion Bascule replacement bridge is recommended. An added benefit of this bridge will be minimal noise created when opening and closing. A new bridge deck configuration will provide improved safety for vehicles, pedestrians, and bicyclists. Public Meeting Minutes
This page last updated on 12/21/12 |
free document readers
If your web browser or screen reader cannot view the photos that are listed on this page, please visit the Contact Page
|
| Copyright MaineDOT © 2012. All rights reserved. |