Freeport RT 125/136 Design Build ProjectThe RFP has been amended as of May 29, 2009 (web page) The Freeport – Route 125/136 Project, MaineDOT PIN: 012782.00, includes the design and reconstruction of 3.03 miles of Major Urban Collector in the Town of Freeport. The Project starts at the intersection of Durham Rd. and Rte. 136/Mallet Dr. and continues 3.03 miles northerly to the Durham Town line. The Project includes intersection improvements at Durham Rd. and Rte. 136/Mallet Dr., intersection improvements at Rte. 136/Durham Rd. and Rte. 125/Griffin Rd., minor vertical and horizontal corrections throughout the Project length, and drainage improvements. Project Schedule
After proposers have been notified and prior to draft RFP issue, the Department will hold a joint meeting with the selected proposers to discuss the Project.