|
|
Capacity* of Rectangular
Sand/Salt
Storage Facility
(Cubic
Yards)
| Width
x Length (ft) |
Wall Fill Height (ft) |
| 9 |
8 |
7 |
6 |
| 40 x 80 |
1400 |
1300 |
1200 |
1100 |
| 40 x 100 |
1800 |
1700 |
1600 |
1500 |
| 50 x 80 |
1900 |
1800 |
1700 |
1600 |
| 50 x 100 |
2500 |
2400 |
2200 |
2100 |
| 60 x 80 |
2400 |
2300 |
2200 |
2100 |
| 60 x 100 |
3200 |
3100 |
2900 |
2700 |
| 60 x 150 |
5300 |
5000 |
4700 |
4500 |
| 70 x 100 |
4000 |
3900 |
3600 |
3500 |
| 70 x 120 |
5000 |
4800 |
4600 |
4400 |
| 70 x 140 |
6100 |
5800 |
5500 |
5200 |
| 70 x 150 |
6600 |
6300 |
6000 |
5700 |
| 80 x 120 |
6100 |
5800 |
5600 |
5300 |
| 80 x 140 |
7400 |
7100 |
6700 |
6400 |
| 80 x 150 |
8000 |
7700 |
7300 |
7000 |
*
Assumptions:
- Concrete walls are filled to noted height on end wall and
both side walls and then sloped upward at material's angle of
repose to maximum height.
- Toe of pile extends to front wall/door.
- No material is piled higher than top of concrete walls.
Updated: January 31, 2008
|