Skip First Level Navigation | Skip All Navigation

Salmon Trap Count Statistics

Adult Atlantic Salmon Trap Catch Summary

The Atlantic Salmon Commission (ASC) staff conducts routine monitoring of the abundance and status of adult Atlantic salmon in many Maine rivers. ASC staff operates traps at fishways and barrier weirs to monitor adult Atlantic salmon returns to the Penobscot (Veazie Dam), Narraguagus (Cherryfield Dam), and Dennys rivers (Dennysville weir); Great Lakes Hydro, America operates a trap at Weldon Dam in the upper Penobscot drainage, Pennsylvania Power and Light operates a trap at the Ellsworth Dam on the Union River; Florida Power and Light operates traps and lifts at two hydroelectric projects on the Saco River, Maine Department of Marine Resources operates one on the Androscoggin River, and the St. Croix Waterway Commission operates a trap at the Milltown Dam on the St. Croix River.

These salmon counting facilities are typically operated from May through early November each year. ASC staff updates the statewide trap catch summary weekly or more often during the peak of the salmon migration. The statewide trap catch table includes counts of sea-run salmon captured on Maine rivers and salmon removed from the river as broodstock for restocking of Maine rivers and DOES NOT include captures of aquaculture strays or captive reared adult salmon released from Federal hatcheries.

Adult Salmon Returning to Maine, by River
River Trap Date of count Count Comments
Penobscot Weldon October 6, 2008 210

Weldon Trap has begin operating June 10..

Aroostook Tinker Dam October 6, 2008 15

Tinker trap began operating July 2, 2008. Trap, closed for over a week in July, is operating.

Kennebec Lockwood Dam October 6, 2008 22

The trap began operating on May 9, 2008.

St. Croix Milltown October 6, 2008 0 on June 30

Trap operations began May 5, 2008, with counts made thru June. The trap is now open for the free passage of fish.

Dennys Weir October 6, 2008 8

Weir installed and in operation on May 13, 2008.

Narraguagus Cherryfield October 6, 2008 25

Trap was installed on April 28, 2008. The first two and one other salmon captured were broodstock from Craig Brook National Fish Hatchery stocked fall 2007 after spawning. One salmon died in the trap, week of July 7. The count includes two salmon observed on video jumping the Ice Control Dam in June.

Union Ellsworth October 6, 2008 0

Trap operations began May 11, 2008.

Penobscot Veazie October 6, 2008 2110

Veazie fishway was opened on Tuesday May 13th, 2008

Broodstock = 650

Androscoggin Brunswick October 6, 2008 17

Trap began operating on May 12, 2008.

Saco Skelton October 6, 2008 40

Trap began operating on May 15, 2008.

Saco Cataract October 6, 2008 62

The East Channel trap began operating May 13, 2008.