The project will determine the effectiveness of an ERP in encouraging specific business sectors to implement stormwater Best Management Practice (BMP) technologies. The project will proceed in the following manner:

  1. Select the study areas using the following criteria: Maine will choose urban, impaired streams that have the highest density of hotspots. Massachusetts will select an urban, significantly impaired stream;
  2. Define the total area of impervious surface of all drive-thrus or malls located in the chosen watershed;
  3. Each state will measure the impervious project area in the watersheds for each targeted business sector to measure water quality improvement based on implementation of BMP technologies;
  4. Solicit participants from the total number of businesses in each sector by using incentives;
  5. Develop compliance assistance tools and delivery methods;
  6. Provide similar compliance assistance in each state, including training workshops (e.g., data and training for the BMPs will be the same);
  7. Using the same menu of stormwater BMPs, each state will assist participants to install the BMPs in their impervious areas;
  8. The team will calculate the modeled percentage of pollutant reductions that will be achieved by the installation of each type of BMP technology, and;
  9. The team will then compare the relative success of the two states’ incentive approaches and their selection of business sectors, and evaluate the transferability of this ERP to a watershed-wide or statewide program.