Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation | Skip All Navigation

Gulf Island Pond Working Group

Introduction

Under authority provided by PL 2003, C.257 (LD 1137), the Department is developing a proposal that resolves the long-standing issue regarding water quality standards for Gulf Island Pond. Because of the considerable interest in this process, DEP has pledged to ensure ample opportunity for public involvement. This page was created as part of that commitment.

Documents and items will be added as they are generated. If you have questions regarding the process or the materials involved, please contact Andrew Fisk at andrew.c.fisk@maine.gov or 207-287-7671.

Photo provided by FPL Energy.

February 7, 2008 - Findings of Fact and Order on Appeal
November 27, 2007 - Androscoggin Appeals
August 8 , 2006 - Final Approved Modification for Rumford Paper Company
May 11, 2006 - Draft Modifications
April, 2006 - Legislative Report
September 21, 2005 - Licenses/Permits Issued
July 25, 2005 - Reposting of revised IP MEPDES permit for 30-day comment period
  • The public comment period on the draft permit will close on August 25, 2005.
July 19, 2005 - Androscoggin River Total Maximum Daily Load (Gulf Island Pond - Livermore Falls Impoundment) approved by EPA
May 13, 2005 - Final Androscoggin River Total Maximum Daily Load (Gulf Island Pond - Livermore Falls Impoundment) submitted to EPA
  • In accordance with section 303(d) of the Clean Water Act, on May 13, 2005, the Department submitted the Androscoggin River Total Maximum Daily Load for Gulf Island Pond and the Livermore Falls Impoundment to the Environmental Protection Agency for review and approval.
  • Final TMDL
  • Final TMDL - figures and tables
Comments Received on Draft Androscoggin River Total Maximum Daily Load (Gulf Island Pond - Livermore Falls Impoundment)

The following comments were received during the public comment period.

Response to Comments Received on Draft Androscoggin River Total Maximum Daily Load (Gulf Island Pond - Livermore Falls Impoundment)
Other

The following documents are in MS Word or Excel format.

May 15 letter to Natural Resources committee describing the process
June 11, 2003 letter to interested parties: process outline/timeline
June 20, 2003 letter to interested parties: announcement of first meeting
June 23, 2003 letter to technical working group; call for technical information
First draft of Treatment Options Matrix (attached to 6/23/03 letter)
July 1, 2003 meeting agenda
July 1, 2003 meeting notes (with attendee list)
July 1, 2003 follow up memo
Revised (DEP) draft of Treatment Options Matrix (7/24/03)
Revised Matrix (8/22/03)
Revised Matrix (9/3/03)
Revised Matrix (options E & F: BOD/TSS 9/25/03)
EPA letter on DO criteria
Modeling Demo (9/17/03): draft meeting notes
Model Output
Model Output Diagrams

DEP responses to 7/1 issues:
Embayment issue
Old v. new data
Chlorophyll-a Number used in Androscoggin River Model

Meeting Information Draft meeting notes: 8/26/03 Technical Working Group

Modeling Workshop 9/17/03: GIPOP Issues Letter (PDF)

Workshop on DEP Model, September 17, 2003, 9:00 a.m.- 12:00 noon, DEP Response Building. This is a technical demonstration with no discussion agenda. An overview of the session will be posted on this site following the demonstration.

Meeting Information 12/08/03 Working Group
Meeting agenda
Modeling Runs Update
Schematics
Chlorophyll-a Concentration used in Androscoggin River Model
McCubbin report (Please be advised that this is a very large pdf file. If you would prefer to receive a hardcopy of the report by mail please contact Mary Breton at mary.b.breton@maine.gov or at 207-287-7671.)
Updated McCubbin report (includes minor data revisions)

Meeting Information 05/12/04 Working Group meeting.
Meeting agenda
GIP Aerial Monitoring Plan
GIP Implementation Plan
GIP Monitoring Plan 04 Summary
GIP POTW MHI Analysis
GIP Monitoring Worksheet
SOP Chemical Analytes
SOP Dissolved Oxygen and Temp  
Meeting Notes

May 19, 2004
Letter from Commissioner Gallagher to William Taylor re: GIPOP Engineering Study

June 24, 2004 Additional Information
GIP Aerial Monitoring Plan
Androscoggin River Overflight Plan
Androscoggin River Sampling Plan
Androscoggin River DEP Monitoring 2004

November 2004 Additional Information
2004 Gulf Island Pond Aerial Monitoring Program; photos

Androscoggin River and Gulf Island Pond Data Report
Data Report
Figure 1
Figures and Tables I
Figures and Tables II
Androscoggin River 2004 DO Temp Secchi
Androscoggin River and Gulf Island Pond Laboratory Results
Dead River Summary
Gulf Island Pond Field Data
Gulf Island Pond Schematics

History