Skip Maine state header navigation

Agencies | Online Services | Help

Skip First Level Navigation > Skip All Navigation

Maine Atlantic Salmon Commission

Site Map

Home > Trap Count Statistics

Trap Count Statistics

Adult Atlantic Salmon Trap Catch Summary

The Atlantic Salmon Commission (ASC) staff conducts routine monitoring of the abundance and status of adult Atlantic salmon in many Maine rivers. ASC staff operates traps at fishways and barrier weirs to monitor adult Atlantic salmon returns to the Penobscot (Veazie Dam), Narraguagus (Cherryfield Dam), and Dennys rivers (Dennysville weir); Great Lakes Hydro, America operates a trap at Weldon Dam in the upper Penobscot drainage, Pennsylvania Power and Light operates a trap at the Ellsworth Dam on the Union River; Florida Power and Light operates traps and lifts at two hydroelectric projects on the Saco River, Maine Department of Marine Resources operates one on the Androscoggin River, and the St. Croix Waterway Commission operates a trap at the Milltown Dam on the St. Croix River.

These salmon counting facilities are typically operated from May through early November each year. ASC staff updates the statewide trap catch summary weekly or more often during the peak of the salmon migration. The statewide trap catch table includes counts of sea-run salmon captured on Maine rivers and salmon removed from the river as broodstock for restocking of Maine rivers and DOES NOT include captures of aquaculture strays or captive reared adult salmon released from Federal hatcheries.

Adult Salmon returning to Maine, by River
River Trap Date of count Count Comments
Saco Cataract June 29, 2009 11

The East Channel trap began operating May 1, 2009.

Saco Skelton June 29, 2009 4

Trap began operating on May 1, 2009.

Androscoggin Brunswick June 29, 2009 16

Trap began operating on May 6, 2009.

Penobscot Veazie Dam June 29, 2009 1,444

Veazie fishway was opened on Monday May 4th, 2009 Broodstock = 660

Union Ellsworth June 29, 2009 0

Trap began operating on May 10, 2009..

Narraguagus Cherryfield June 29, 2009 4

Trap was installed May 1. It is modified to count shad. Shad Count = 187

Dennys Weir June 29, 2009 4

Weir was installed and in operation May 13.

St. Croix Milltown Dam June 29, 2009 0

Trap operations began May 11, 2009. Counts will be available thru June, then the trap will be open for the free passage of fish.

Kennebec Lockwood Dam June 29, 2009 10

The trap began operating on April 30, 2009. Five of the fish caught were stocked as a pre-spawn adult last fall in the Sandy River.

Aroostook Tinker Dam June 29, 2009 3

Tinker trap will began operating June 15, 2009.

Penobscot Weldon Dam June 29, 2009 5

Weldon Trap began operations on June 10. Fish captured at this trap were released into the Penobscot River after being counted at the Veazie trap.

Sebasticook Benton Falls June 29, 2009 0